My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 11/09/1995
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1995
>
Agenda - Planning Commission - 11/09/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 4:28:47 PM
Creation date
10/1/2003 9:06:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
11/09/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. <br /> <br />11. <br /> <br />12. <br /> <br />13. <br /> <br />14. <br /> <br />15. <br /> <br />16. <br /> <br />17. <br /> <br />No grading operation shall be conducted closer than 30 feet to the fight of way line of any <br />existing or platted street, road or fight of way. <br /> <br />Prior to commencing any grading operations, a cash escrow or letter of credit approved as <br />to form by the City in the amount of Five Thousand Dollars ($5,000.00) shall be deposited <br />with the City. This financial guarantee may be used by the City to pay for the cost and <br />expense of repairing any public fight of ways or regrading and stabilizing eroded areas due <br />to the grading operation, pay for any cost associated in administering the requirements of <br />this Chapter of the. City Code, and to pay for any restoration of the worksite not properly <br />restored upon completion2 <br /> <br />The Permit Holder shall implement sediment and erosion control practices. No grading <br />activity shall occur within twenty-five (25) feet of a property line unless silt fence is placed <br />along the property line to prevent sediment from washing onto the adjoining property. Any <br />erosion which causes gullies of greater than one (i) foot within twenty-five (25) feet of a <br />property line shall be regraded within forty-eight (48) hours of the precipitation event that <br />caused the erosion. <br /> <br />There shall be no stockpiling of graded materials, other than the topsoil on a temporary <br />basis, allowed within thc boundaries of the Subject Property. Topsoil stockpiles shall not <br />exceed 900 cubic yards in total nor six (6) feet in height. <br /> <br />The type and placement of imported soils shall be subject to the prior approval of the City <br />Engineer. Imported topsoil shall not be placed more than 12 inches in depth. <br /> <br />The permit holder shall file with the City a liability insurance policy or certificate of such <br />insurance acceptable to the City and issued by an insurance company authorized to do <br />business in the State of Minnesota. <br /> <br />a. The policy shall insure the permit holder for the sum of at least $300,000 for injury to <br /> one person and $500,000 for one accident, and at least $1,100,000 property damage. <br /> <br />Said policy shall be for the full period of the permit and shall provide for the giving of <br />10 days prior notice to the City by registered mail of termination, cancellation or <br />amendment of the policy. <br /> <br />In the event said policy is terminated for any reason, the permit shall be automatically <br />suspended upon the day the policy terminates unless a new policy complying with this <br />item is obtained and fried with the City prior to the termination of the policy in force. <br /> <br />The maximum noise level at the perimeter of the worksite shall be within the limits set by <br />the Minnesota Pollution Control Agency and the Environmental Protection Agency of the <br />United States. <br /> <br />All grading operations shall be conducted in accordance with the grading plan dated <br />October 17, 1995 prepared by Ulteig Engineers, Inc. The proposed area to be graded is <br />roughly two acres in size. Excavation of the entire area shall be permitted. Continuation of <br />grading shall require finished grade areas to be restored with four (4) inches of topsoil, <br />seed and disc anchored mulch. <br /> <br />Ail restoration shall consist of spreading a minimum of four (4) inches of topsoil, fertilizer, <br />seed and mulch. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.