My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council Work Session - 09/15/2003
Ramsey
>
Public
>
Minutes
>
Council Work Session
>
2003
>
Minutes - Council Work Session - 09/15/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 4:11:00 PM
Creation date
10/2/2003 10:04:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council Work Session
Document Date
09/15/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and were broken down by phases and infrastructure. The next set of boxes (42 through 50) is the <br />estimated debt ratios and the last box shows the Enterprise Debt Service. <br /> <br />Discussion ensued relating to the debt and what it will be when the fees are collected. Mr. <br />Donna presented worst case scenario. <br /> <br />Councilmember Zimmerman inquired if land is set aside for wells, to which Assistant Director of <br />Public Works Olson responded that land is dedicated to the City or is available to the City. He <br />described well connections, piping, etc., to hook up to the system. A treatment system was also <br />discussed. Mr. Olson stated that the Charter School is committed to the first phase as is some <br />residential building. <br /> <br />Tim Engen added there are 900 units in the first phase. <br /> <br />Mr. Olson presented the phasing plan, the sewer and water improvements, the storm sewer <br />improvements, talked about the size of sewer pipes needed and the cost of same. He pointed out <br />the ponds and talked about the connecting pipes and the fact that the storm sewer costs shot way <br />up. The developer will install or put up sureties to make sure the storm sewer gets constructed. <br />That reduced the amount the City was responsible for. Mr. Olson talked about boring under <br />roads and doing the constructing so that we do not have to dig into streets again. The City asked <br />the developer to change that to be their responsibility. Assistant Director of Public Works Olson <br />summarized the red lines on the map showing the City's Phase I streets and utilities as well as <br />Phase II streets and utilities. Total debt service is about $7.4 million. If the City had to borrow <br />the entire amount and pay it back over a 10-year period; that would be the worst case scenario. <br /> <br />City Administrator Norman pointed out that the City has more fees coming in than we have debt. <br /> <br />Counci hnember Zimmerman inquired what if things cost more than proposed. <br /> <br />Councilmember Elvig stated that the City is well protected from revenue shortfalls on two facets; <br />we could pick it back up. <br /> <br />Councihnember Strommen agreed that the City is well protected. <br /> <br />Tim Engen reported that next week, the Charter School will write a check to the City for $57,000 <br />and shortly thereafter, a check will be written for between $180,000 to $ I90,000 for residential. <br /> <br />Mr. Norman stated that we are focusing on debt and we may not even have to bond. <br /> <br />Councihnember Eivig referred to the development agreement. Section 8.4 says the City has the <br />ability for special assessments if we experience a shortfall. Section 8.8 also protects the City by <br />stating that we can raise fees if necessary. If hook ups are more than we anticipated, we can <br />balance them. <br /> <br />Mr. Olson added that we have generally increased fees 3% to 4% annually, and that has not been <br />brought into this discussion. <br /> <br />City Council Work Session/September 15, 2003 <br /> Page 4 of 10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.