Laserfiche WebLink
Scenario 3: Apartment Building, Section D: City Water Connection (Permit) <br />City: <br />Blaine <br />Coon Rapids <br />Dayton <br />Medina <br />Elk River <br />Cambridge <br />Big Lake <br />St. Francis <br />Prior Lake <br />Monticello <br />Ramsey <br />City Water Connection (permit) <br />250000 <br />200000 <br />150000 <br />100000 <br />NO ANSWER <br />$100 <br />$150 <br />Hourly inspection rate <br />Water and Sewer in same permit <br />$50 <br />50 <br />$50 per unit <br />1% of cost (of total project valuation) <br />$55.00 <br />2% of total valuation = $216,000 <br />City Water Connection (Permit) <br />$6,000 <br />$6,000 $6,000 <br />$108,000 <br />$216,000 <br />50000 $18,000 <br />$12,000 <br />boo • Oa •%\e, �\ �� � a � �� �\� �� �� ▪ a Q�` �� 1 <br />$6,600 <br />Appendix 851 Page <br />