Laserfiche WebLink
Scenario 3: Apartment Building, Section D: City Sewer Connection (Permit) <br />City: <br />Blaine <br />Coon Rapids <br />Dayton <br />Medina <br />Elk River <br />Cambridge <br />Big Lake <br />St. Francis <br />Prior Lake <br />Monticello <br />Ramsey <br />City Sewer Connection (permit) <br />250000 <br />200000 <br />150000 <br />100000 <br />50000 <br />0 <br />NO ANSWER <br />$100 <br />$150 <br />Hourly inspection rate (along with other infrastructure inspections) for apt and commercial <br />65 + 2000 bond (includes water connection permit) <br />$50 <br />50 <br />$50 per unit <br />1% of cost (of total project valuation) <br />$65.00 <br />2% of total valuation = $216,000 <br />$12,000 <br />City Sewer Connection (Permit) <br />$18,000 <br />$7,800 $6,000 <br />$6,000 $6,000 <br />$108,000 <br />$7,800 <br />$216,000 <br />\ , (` e �6� � o � ` �a ��� �z e ��5 �� ��o �J <br />.q>- <-< pad �� � �\ so <br />.(c\ `� • • ot �a ;\ ae <br />Looms ((- (act c-,--- Q�\ �o Q <br />Appendix 841 Page <br />