Laserfiche WebLink
Scenario 4: Industrial Development, Section D: City Sewer Connection (Permit) <br />City: <br />Blaine <br />Coon Rapt s <br />Dayton <br />Medina <br />Elk River <br />Cambridge <br />Big Lake <br />St. Francis <br />Prior Lake <br />Monticello <br />Ramsey <br />60000 <br />50000 <br />40000 <br />30000 <br />20000 <br />10000 <br />0 <br />Section D: <br />NO ANSWER <br />$100 <br />$150 <br />Hourly inspection rate (along with other infrastructure inspections) for apt and commercial <br />100 + 2000 bond (includes water connection permit) <br />$50 <br />35 <br />NO ANSWER <br />1% of cost (of total project valuation) <br />$65.00 <br />2% of valuation = 50,000 <br />City Sewer Connection (Permit) <br />$100 $150 $100 $50 $35 <br />$50,000 <br />` o� • c a �t z � z `' N N ¢ O o • � �a\ �a <2 J� a\ �\� t` ��O \� �a a � o �a c � <br />Go t Qt\ t 4") <br />Appendix 112 1 P a g e <br />