Laserfiche WebLink
Scenario 4: Industrial Development, Section D: City Water Connection (Permit) <br />City: <br />Blaine <br />Coon Rapt s <br />Dayton <br />Medina <br />Elk River <br />Cambridge <br />Big Lake <br />St. Francis <br />Prior Lake <br />Monticello <br />Ramsey <br />60000 <br />50000 <br />40000 <br />30000 <br />20000 <br />10000 <br />Section D: <br />NO ANSWER <br />$100 <br />$150 <br />Hourly inspection rate <br />Water and sewer together <br />$50 <br />35 <br />NO ANSWER <br />1% of cost (of total project valuation) <br />$55.00 <br />2% of valuation = 50,000 <br />City Water Connection (Permit) <br />100 150 50 35 <br />25,000 <br />55 <br />50,000 <br />o� c z� e \ L C. `5 \ - \ �o ZA <br />a J� era` � . `, a� \' \ �z �� <br />a �` <br />Appendix 113 1 P a g e <br />