My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 08/23/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:16:21 PM
Creation date
8/19/2011 8:57:50 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. Park Dedication. The Plat is located in the CITY's Prairie District. The current park <br />dedication requirement for assisted living complexes is $4,738 per acre. The amount due <br />for the Plat is Thirty One Thousand Forty Three Dollars and No Cents ($4,735 x 6.55 <br />acres = $30,778.00). The rate in effect the time this Contract is executed shall be <br />collected. <br />20. Trail Development Fees. The current trail development fee is $600 per dwelling unit. <br />The amount due for the Plat is Forty Three Thousand Two Hundred Dollars and No <br />Cents ($600 x 33 units = $19,800.00). PERMITTEE is constructing trail improvements <br />to connect the existing trail along Nowthen Boulevard through Lot 1. These <br />improvements located on the remaining parcels to be consolidated into the existing parcel <br />shall be considered off -site improvements and actual construction costs shall be eligible <br />for credit against Trail Development Fees, as indicated on Exibit A attached hereto. The <br />rate in effect the time this Contract is executed shall be collected. <br />21. Water and Sanitary Sewer Connection (Trunk) Fees. The current water connection fee is <br />$2,308 per unit. The current sanitary sewer connection fee is $1,318 per unit. The total <br />amount due on the Plat is Seventy Six Thousand Three Hundred and Eight Dollars and <br />No Cents ($2,308 x 33 units = $76,164.00) for water trunk fees. The total amount due on <br />the Plat is Forty Three Thousand Four Hundred Ninety Four Dollars and No Cents <br />[$1,318 x 33 units = $43,494.00). The rate in effect the time this Contract is executed <br />shall be collected. <br />22. Water and Sanitary Sewer Lateral Fees. The current water lateral fee is $2,308 per <br />connection. The current sanitary sewer lateral fee is $1,318 per connection. The total <br />amount due on the Plat is Twelve Thousand Nine Hundred Twenty Six Dollars and No <br />Cents ([$9,102 x 1 connection = $9,102] + [$3,824 x 1 connection = $3,824] = <br />$12,926.00). The rate in effect the time this Contract is executed shall be collected. The <br />cost to extend these services to the proposed building shall be credited to these fees. <br />23. Stormwater Management Fee. The current stormwater management fee is $4,465 per <br />commercial acre. The amount due for the Plat is Fifteen Thousand Three Hundred Forty <br />Five Dollars and No Cents ($465 x 33 units = $15,345.00). The rate in effect the time <br />this Contract is executed shall be collected. <br />24. Future Development Fees. PERMITTEE agrees that none of the above fees are being <br />collected for any of the outlots in the Plat, and therefore said outlots are subject to similar <br />fees at a future date when such outlots are subdivided for development. <br />25. Trail Construction. Trails shall be constructed along Nowthen Boulevard with a ten foot <br />width. Any trail constructed on private property within the Plat (not in right of way) shall <br />be encumbered by a perpetual trail easement in accordance with Item #26 below. Due to <br />the fact that the fmal alignment of the required trail along Saint Francis Boulevard has <br />not yet been determined, in addition to future development to occur on the Subject <br />Property, a trail will not be required along Saint Francis Boulevard at this time. In lieu of <br />construction of the trail, a twenty (20) foot perpetual trail easement along Saint Francis <br />Boulevard shall be required to be recorded simultaneously with the Plat. Construction <br />STONEY RIVER <br />Development Agreement <br />Page 8 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.