Laserfiche WebLink
8) <br /> <br />9) <br /> <br />13) <br /> <br />14) <br /> <br />16) <br /> <br />17) <br /> <br />18) <br /> <br />20) <br /> <br />That the equipment housed in the smucture includes two process modules, fuel cell <br />stack, start-up heater, start-up skid, load bank, LFG cleanup system, Data <br />acquisition system and conn-ol room. Thc equipment will utilize the iandfiI1 gas <br />currently generated by thc landfill to demonstrate the potential use in generating <br />electricity. The equipment has redundant safety features inclmiing automatic shut- <br />down procedures. <br /> <br />Thc test faciliw will also include two (2) temporary mobile structures to provide <br />office and bathroom facilities for project personnel. <br /> <br />That thc Applicant has indicated that at the conclusion of the test demonstration, the <br />snmcture will be removed from the Site and the equipment will be transported to <br />another project site not within the Ciw limits. <br /> <br />That the Applicant has indicated that zero residue from the test operations will <br />rernmin on the Site; that all by-products are sh/pped out of state. <br /> <br />That the Applicant has stated that no State or County permits are required for the <br />test demonstration facility. <br /> <br />That the permit being sought is for a per/od of one (I) year to accommodate site set- <br />up, 4,000 hours of demonstration testing and site teardown. <br /> <br />That the property south and west of the Site is zoned Industrial and Residential to <br />the north and east. <br /> <br />That the test demonstration fazili5, is proposed to ~ located approximately 500 feet <br />from the nearest residential dwelling. <br /> <br />That mater/als and supplies required to support the demonstration will be delivered <br />by truck to the Site utilizing the existing landf'H1 entrance off Sunfish Lake Blvd. <br />N.W. <br /> <br />That the Applicant has indicated that the test demonstration facility will be a 24 hour <br />a day operation. <br /> <br />That the Applicant has indicated that the methane gas extracted from the landfill <br />during the test demonstration w/Il not impact the flow of gas necessary for the <br />power supply to Waltek, Inc. <br /> <br />That the Applicant has indicated that the noise factor associated with the operational <br />characteristics of the landfill gas/fuel cell system wLll be lower than the noise level <br />of the existing blowers located at the site as part of the groundwater treatment <br />facihry. <br /> <br />That the Applicant has inddcated that the odor factor will be less than cu~ent <br />existing odors at the Site for the following reasons: <br /> <br />the demonsmafion project will utilize the land2ll gas flow prior to the <br />existing flaring process; and <br /> <br />b) <br /> <br />the gas wilt ~ introduced into a clean-up process system prior to <br />introduction into the fuel cell. <br /> <br /> <br />