My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/14/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 10/14/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:55:26 PM
Creation date
10/13/2003 7:48:05 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/14/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15153 Nowthen Boulevard NW · Ramsey, Minnesota 55303 <br />City Hall: ('763) 427-1410 · Fax: (763) 42?-5543 <br />www.ci.ramsey.mn.us <br /> <br />October 16, 2002 <br /> <br />Chris Bulow <br />Bulow, Inc. <br />10444 95~a Street NE <br />Monticello, M-N 55330 <br /> <br />Re: Revised ©fading:Plan for Mallard Ponds Office Building <br /> <br />Dear Mr. Bulow: <br /> <br />I have received and reviewed a revised grading plan'prepared by Bogart, Pederson & Associates, Inc. <br />dated August 28,02 (revision was not noted in title block). This revised plan is generally acceptable, <br />however, approval is subject to the following conditions: <br /> <br />1) <br /> <br />Either a catchbasin should be added on the west side of the drive entrance to intercept runoff or <br />documentation needs to be provided showing that the overland flow is being transmitted to catchbasin <br />101 and not onto 139~ Lane (aCtually 140m Lane). <br /> <br />2) Elevation should be provided for the "grade break". <br /> <br />3) The north ditchline ofCR116 contains an existing sump area. This ditch should be regarded such that <br /> it flows to the east. <br /> <br />4) All stormwater piping associated with this development must be contained withhn drainage and utility <br /> easements. Currently MH 103 lies outside a drainage and utility easement. <br /> <br />5) <br /> <br />The minimum stormwater pipe size is 15 inch, other than catchbasin leads which are limited to 30 <br />feet. The plan proposes 12 inch pipe. The City will maintain the storm sewer only if it is constructed <br />to City standards and encumbered with a drainage and utility easement. <br /> <br />This commercial site is less. than one acre in area, and is not required to obtain a Lower Rum Pdver <br />WMO permit. However documentation must be provided to show that the sediments pond receiving <br />the runoff from this site contains sufficient storage volume to meet water quality requirements. <br /> <br />A final revised plan must be submitted prior to the commencement of site grading. <br /> <br />Sincerely, .,~ ,, ..', ., <br />City Engineer <br /> <br />S J/is <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.