Laserfiche WebLink
items prior to recording of the final Plat. The City Engineer's estimated cost of construction <br />is: <br /> <br />a) Street striping and signing (4@$200) $800 <br />b) Traffic signing (5~$200) $1,000 <br />c) Future Through Street Signing (1~$200) $200 <br />d) Street lights (10 ~$1500) $15,000 <br />e) Street light maintenance (10 @$270) $2,700 <br />f) Street sweeping $300 <br />g) Seal Coating (8,900 sq. yds ~$.85/sq. yd.) $7,565 <br /> <br />("Stage II Improvements") <br /> <br />Total $27,765 <br /> <br />10. Hard Surlier Driveways. Hard surfaced driveways (bituminous or concrete) are a <br /> requirement for each lot in the Plat. Said improvement shall be installed by the building <br /> permit applicant or the homeowner at the time the Certificate of Occupancy is issued or as <br /> soon thereafter as possible, weather permitting. In the event this improvement is not timely <br /> installed on a lot, the DEVELOPER and/or the DEVELOPER'S assign(s), agrees that the <br /> CITY may itlstall said improvement on the lot and specially assess the cost therefore against <br /> the lot. The-DEVELOPER hereby waives all right to a public hearing and other statutory <br /> rights or City Charter rights granted a property owner relating to special assessments, <br /> including the right to appeal the special assessment for installation of the hard surfaced <br /> driveway. In addition, the DEVELOPER grants the CITY a license to enter on each lot of <br /> the Plat in or. der to install the improvement described in this paragraph if the same has not <br /> been previous~ly constructed. <br /> <br />11. Street Clean!ng. After the street surfacing is installed, the DEVELOPER shall clear any <br /> soil, earth, or debris from the streets within the Plat resulting from any construction within <br /> the Plat by the DEVELOPER or its successors and assigns. From time to time, the CITY <br /> may remove ;accumulations of soil, earth and debris from the streets resulting from the <br /> construction of the Plat. It shall be the DEVELOPER'S responsibility to pay the costs <br /> associated with this necessary street cleaning. Invoices from the CITY to the DEVELOPER <br /> for such costs shall be paid within fifteen (15) days of the date of invoice. <br /> <br />12. Private Streets and On-Street Parking. On-street parking shall be prohibited on private <br /> streets. All parking restrictions shall be signed and said signing shall be subject to the <br /> approval of the CITY. At no time will the private streets be maintained or accepted for <br /> ownership by the CITY. These items shall be clearly stated in the covenants drafted as part <br /> of the homeowners association. The association documents shall include appropriate <br /> enforcement p~ovisions. <br /> <br />13. Private Street Cleaning. In the event the CITY determines that the private streets and <br /> driveway collectors are contributing to the increased sedimentation of the ponds that the <br /> CITY is required to maintain, the CITY shall provide the homeowner's association with <br /> Town Center Gardens Subdivision <br /> Development Agreement <br /> Page 6 of 12 <br /> <br /> <br />