Laserfiche WebLink
Page 1 of 1 <br />William Fossing <br />From: Erie, Cyle [CErie@braunintertec.com] <br />Sent: Wednesday, August 31, 2011 3:16 PM <br />To: William Fossing <br />Cc: Glisson, Matthew <br />Attachments: CPT Logs.pdf; Soil Boring Location Sketch.pdf; SPT Logs.pdf <br />Bill - <br />The SPT and CPT Togs and location sketch are attached. The hammer used should be rated for an energy <br />of 40,000 to 65,000 ft-Ibs. <br />Our recommended inspections and testing for the pile -related work includes PDA and CAPWAP analysis <br />on 2 production piles, installation observations, concrete testing, vibration monitoring of the existing <br />structure, and a final special inspection report when pile installation is complete. The estimated costs <br />for all of this is about $8,000. You could also do a pre -condition survey of the existing ramp if the City <br />would like to do that that would be about $1,500. <br />Let me or Matt know if you need anything else or have questions with anything. <br />Thanks! <br />Cyle <br />IN1`ERTEC <br />Employee Ownership <br />working for you <br />Cyle N. Erie, PE <br />Associate Principal/Project Engineer <br />3900 Roosevelt Road, Suite 113 I Saint Cloud, MN 56301 <br />320.202.7224 direct 1612.490.1961 mobile <br />cerieP braunintertec.com <br />braunintertec.com 'Twitter: Braun Intertec I Linkedln: Braun Intertec <br />9/7/2011 <br />