Laserfiche WebLink
We are uncertain of the ultimate use of thc portion of Outlot B casl of the <br />wetland. Perhaps this area should be distributed among thc lots in Block 1. <br /> <br />Grading and Drnin~?: h will be necessary to ill] a small portion of the <br />wetland to accommodate this phase. Because the area of filling is less than <br />r400 squarc feet, an exemption from providing a rcplaccmem plan could be <br />mnficipated. However, the Developer must apply to the Lower Rum River <br />;Water Management Organization for an exemption from the wetland <br />conservation act. A plan for the grading and drainage must be submitted. It <br />might be anticipated that drainage will be directed to the wetland in Ougot B. <br />Sedimentation should be provided prior to discharge into this wetland. A <br />hydrological ana.}ysis should be prepared on the runoff impact of the project <br />on the wetland. If the bounce of the water level from a runoff even; is <br />:significant, an outlet from the wetland to Sunfish Lake may be required. <br /> <br />The Planning Commission will be meeting on Tuesday, Ju}y 5, 1994 at '7:30 p.m. <br />to continue the public hearing to revise the approved preliminary plat for Chestnut <br />I-{ill to allow for the redesign of 145th Lane N.W. in order to avoid consa-ucdng a <br />road through the wetland. A copy of the case cover sheet is enclosed for your <br />information, h is impormm that you, or your representative, be present to answer <br />an5, questions that ma.',, arise. Thank you for your cooperation. <br /> <br />Respectful}y, <br /> <br />CITY OF RAMSEY <br /> <br />Sylvia l::rolik <br />Zoning,Adminisrrat0r <br /> <br />Steven Jankowski <br />CiB, En~neer <br /> <br />Enclosure <br /> <br /> <br />