My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/22/1994
Ramsey
>
Public
>
Agendas
>
Council
>
1994
>
Agenda - Council - 08/22/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 4:09:33 PM
Creation date
10/14/2003 8:29:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/22/1994
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it is anticipated that some fill will be necessary, on the lot. A longer than normal driveway will be <br />required because the home will be set farther back on the lot than the standard 40 foot setback; <br />therefore, there will be additional costs for blacktop for the extended driveway, There are also <br />some other upgrades that the City should be pursuing such as low maintenance siding, a walk-out <br />exit on the side or rear of the home, and yard establishment, The builder and ACCAP have also <br />suggested aesthetic up~ades such as applying, brick to the front of the lower level and convening <br />the box window on the front of the home to a bay window. <br /> <br />Recommendation: <br /> <br />City Staff is recommending that $5,000 of the net revenue be allocated to A CCAP for project <br />upgraades to ensure the project will be an improvement to the neighborhood. The project up~ades <br />would be prioritized as follows: CWhere k_nown, estimated costs are so noted). <br /> <br />4. <br />5. <br />6. <br />7. <br /> <br />Fill <br />Black-top costs for over-extended driveway ($500-$1000) <br />Maintenance flee sichng ($3,000) <br />Side walkout ($500) <br />Establishment of turf <br />Brick facade on the front of the lower level <br />Bay window ($200) <br /> <br />The builder will be informed that upgrades to brick facade and bay window should not be <br />considered unless a yard has Ken established to the satisfaction of the City. <br /> <br />CiD, Staff recommends approval of the house plans and allocation of $5,000.00 to ACCAP for <br />project up,aries. <br /> <br />Council Action: <br /> <br />Morion to: <br />Approve/deny the house plans prepared by JerneI1 Construction for the construction of a <br />home on Lot .3, Block 5, Beaudry~s 2nd Addition and further to allocate $5,000 to ACCAP <br />to be used for project up,aries. <br /> <br />Review Checklist: <br /> <br />CC: <br /> <br />CiD, Adm.inis=ator <br />Builcimg Official <br />CiD' En~neer <br /> <br />8/22/94 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.