My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/22/1994
Ramsey
>
Public
>
Agendas
>
Council
>
1994
>
Agenda - Council - 08/22/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 4:09:33 PM
Creation date
10/14/2003 8:29:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/22/1994
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINDINGS OF FACT <br /> <br />SUN~,VOOD <br />INDUSTRY <br /> <br />D[~IVE N.I~'. THOROUGHFARE BETWEEN KRS'PTOr,' STREET N.~. AND <br />AVENUE N.V~'. (COUNTY ROAD #116) ENVIRONMENTAL ASSESSMENT <br /> ~,x,' OR KStt EET <br /> <br />The City of R~.msey proposes to construct the Sunwood Drive N.W. thoroughfare between <br />Krypton Stree;iN.\V. and lndustry Avenue N.W. (Count3, Road #] 16) which is a 1.3 mile <br />segment of street in the City's Municipal State Aid Street system An Environmental Assessmem <br />Workshee~ (EAW) has been prepared pursuant to state statute. The EAW and other pertinent <br />information have been reviewed in accordance with state statutes to determine whether the project <br />has the potentiallfor significant environmental effects· The findings and conclusion of that review <br />are contained in lhis document. References are cited in brackets at the end of each sex:don. <br /> <br />I, TYPE, EXTENT AND REVERSIBILITY OF ENVIRONMENTAL EFFECTS <br /> <br />Project Size and Cosl <br /> <br />The proposed project area is 12.70 acres and is located in the southeast portion of the City <br />of Ramsey. The improvement consists of 1.3 miles of street construction. The estimated <br />cost of the construction is estimated to be $814,73.3. <br /> <br />Permits and Approvals <br /> <br />Permits and approvals required for the project are City of Ramsey Environmental Permit, <br />Anoka Count,',, access to coun~ roads, DN-R permit to alter a wetland, U.S. Army Corps of <br /> · g <br />Engmeer~; permit to alter a wetland and Lower Rum River Drainage District Drainage Plan <br />Permh.~ <br /> <br />Land Use and Local Plans and Ordinances <br /> <br />The proposed thoroughfare is located in the urban s~rvice area of the City. The project is <br />consistent with the proposed land use, the CiB"s Comprehensive Plan and the City's <br />Thoroug§fare Plan. <br /> <br />Topo~a~hy, Soils and Geology <br /> <br />The topography on the project is rolling, ran~ng in elevation from approximately $78 to <br />889 feet i~bove sea level. The soils on the pr~ect site consist of Hubbard coarse sand, <br />Nymore loamy sand, tsanti sand and Marsh. (EAW, Anoka Co. Soils Survey and the <br />City's Comprehensive V,;ater Stud),.) <br /> <br />Ground Water <br /> <br />Temporary dewatering for roadbed construction and peat excavation may be required in the <br />wettands.i The EAW states that ~oundwater ¥.aries from 0.0 minimum to 12 feet on the <br />average. Dnce the project is complete, ~ound.water levels will return to normal. Ground <br />water qu~lit), should not be affected by this project since all peat excavations will be <br />replaced ,~vith clean fill. <br /> <br />Shorelands, Floodplains, Wetlands and Rivers <br /> <br />The prop,osed road alignment crosses two protected wetlands 114P and 673W' and s"Idrrs <br />the southern edge of Sunfish Lake Wetland 113W. The total area of wedand impacted by <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.