Laserfiche WebLink
Changes nmde during construction will be shown in red on a set ofbluelines and will be current at all <br />times. Final as-built drawings will be prepared upon completion of the project and submitted <br />showing actual layouts, alignments and grades. <br /> <br />The cost for Task 5 is $39, I20. <br />The cost for Construction staking is $12,500. <br /> <br />SUMMARY OF PROJECT COSTS: <br /> <br />The project costs for Tasks 1 through 3 are as follows: <br /> <br />Task 1 $38,706 <br />Task2 $ 6,810 <br />Task 3 $ 4,600 <br /> <br />Total for Tasks i through 3 is $50,i16 <br /> <br />The project costs for Tasks 4 through 5 are as follows: <br /> <br />Task 4 $3,370 <br />Task 5 $39,120 <br />Construction staking $12,500 <br /> <br />Total Cost for Tasks 4 through 5 is $54,990 <br /> <br />Project total for tasks 1 through 5 is $105,106 <br /> <br />Attached to this letter proposal is a detailed breakdown of estimated hours for each task. <br /> <br />Assuming the above scope of services is acdeptabte, RLK v~511 begifi Work immediately upon authorization <br />to proceed. <br /> <br />Sincerely, <br /> <br />RLK Associates, Ltd. <br /> <br />Dick Koppy <br /> <br />I h~reby approve the contents of this proposal and request immediate commencement of the project <br /> <br />activities at my specific Erection. <br /> <br />Steve Jankowski, City Engineer <br />City of R.amsey <br /> <br />Date <br /> <br /> <br />