Laserfiche WebLink
Changes made during construction will be shown in red on a set of blue line plans and will be current at <br />all times. Final as-built drawings will be prepared upon completion of the project and submitted showing <br />actual layouts, alignments, inverts and grades. <br /> <br />B. Obtain necessary soil borings: <br /> <br />STS Consultants Ltd. will provide the required soils investigation, (See attached proposal) <br /> <br />COMPENSATION <br /> <br />The estimated project costs are as follows: <br /> <br />TASK 1 - BASIC SERVICES <br /> <br />$82,500 <br /> <br />The basic services will be compensated on an hourly basis not to exceed the above fee. <br /> <br />TASK 2 - TECHNICAL SERVICES <br /> <br />Inspection and as-builts $45,500 <br />Construction staking $11,000 <br /> <br />The above costs will be billed on an hourly basis. <br /> <br />Soil borings $9,365 (See attached proposal) <br /> <br />Project total cost $148,365 <br /> <br />Assuming the above scope of sen, ices is acceptable, RLK wilt begin work immediately upon authorization <br />to proceed. <br /> <br />Sincerely, <br /> <br />RLK Associates, Ltd. <br /> <br />I hereby approve the contents of this proposal and request immediate commencement of the project <br />activities at my specffic direction. _ <br /> <br />Steve Jankowski, PE Date: <br />CiB, Engineer <br /> <br /> <br />