My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/27/1994
Ramsey
>
Public
>
Agendas
>
Council
>
1994
>
Agenda - Council - 09/27/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 4:09:49 PM
Creation date
10/14/2003 8:59:08 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/27/1994
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TEAM MEMBERS <br /> <br />For this project. RLK will assign the following staff so to successfully complete the design work and <br />construction inspection. <br /> <br />Overall project supervision will be provided by Dick Koppy. Mr. Koppy has over 26 years experience in <br />the municipal engineering field. He will be responsible for the overall performance of the project team. <br /> <br />Project management will be provided by Don Shaffer. Mr. Shaffer Ires over 25 years of experience in the <br />management of design and construction for major projects. He will coordinate all work performed by the <br />project team and x~411 also work closely with Mr. Koppy. Mr. Shaffer is currently project manager for the <br />Excelsior Boulevard reconstruction project and for the final design of 153rd Ave. N.W. in Ramsey. <br /> <br />Project Engineer will be Lar .fy Brown. Mr. Brown has over 9 years of experience in the municipal <br />engineering field. He was responsible for the design and construction of sanitary and watermain trunk <br />lines as the assisstant cit3., engineer for the City of Chanhassen. <br /> <br />Design engineering will be provided by Fran Hagen and Truc Ho. Mr. Hagen has over 13 years of <br />experience in site layouts and also municipal street projects. He will provide his expertise in the sizing <br />and layout of the sanitary sewer m the AEC development site. <br /> <br />Mr. Ho is experienced in hydraulics and ground water issues. He will work with STS so to provide <br />methods of handling possible groundwater problems. <br /> <br />Construction inspection will be provided by Chuck Poppler. Mr. Poppler has over 28 years of experience, <br />the majori~ of which has been in the construction area. Mr. Poppler is currently in charge of construction <br />inspection for the Excelsior Boulevard reconstruction in St. Louis Park and for two street reconstruction <br />projects in Hopkins. <br /> <br />STS will provide the reuired soil borings and also the material teasiing during construction. They will <br />work with our staff in handling possible groundwater issues. STS is currently working with RLK on the <br />soils investigation for 153rd Avenue N.W. project. <br /> <br />Egan Field Nowak will provide the required surveying services for this project. They will work closely <br />with RLK to identi~' and prepare legal descriptions for easements required outside the dedicated rights-of- <br />way. They also will provide the necessary construction staking for the sanitary sewer lines and the <br />watermain. <br /> <br />Adequate availability with backup of key staff is necessary not only to meet schedules but to provide a <br />high quali5, design and bid package. RLK is a firm with over 30 full-time employees x~4th over third <br />being professionals. The current workload is such that we will have the personnel identified in this <br />proposal available to work on the extension of sewer and water trunks to sen, ice AEC expansion site. We <br />have the experienced staff to perform all necessary, construction engineering services required for this <br />project. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.