Laserfiche WebLink
attorney's fees, arising therefrom. Further, Contractor shall observe and abide by and perform all of <br />its obligations hereunder in accordance with all applicable laws, rules and regulations of all <br />governmental authorities having jurisdiction, including the Federal Occupational, Safety and Health <br />Act. Contractor agrees to take affirmative action to not discriminate against any employee or <br />applicant for employment because of race, creed, color or national origin. To the extent applicable, <br />Contractor will comply with all provisions of any executive orders and any rules, regulations, orders, <br />instructions, designations and other directives promulgated by any governmental unit with <br />jurisdiction thereof. Violation of this provision, after notice, shall be a material breach of this <br />Agreement and may result, at the Owner's option, in a termination or suspension of this Agreement in <br />whole or in part. <br />10.3 The Contractor will pay all sales, consumer, use and other similar taxes required by the law of <br />the place where the Work is to be performed. <br />ARTICLE 11. Availability of Lands; Physical and Subsurface Conditions; Reference Points <br />11.1 The Owner will provide, as indicated in the Contract Documents and not later than the date <br />when needed by the Contractor, the lands upon which the Work is to be done, rights -of -way for <br />access thereto, and such other lands which are designated for the use of the Contractor, the Contractor <br />will provide all additional lands and access thereto that may be required for temporary construction <br />facilities or storage of materials and equipment. <br />11.2 The Contractor will properly notify the Owner and Engineer in writing of any subsurface or <br />latent physical conditions at the site differing materially from those indicated in the Contract <br />Documents. The Engineer will promptly investigate those conditions and advise the Owner in <br />writing if further surveys or subsurface tests are necessary. Promptly thereafter, the Owner will <br />obtain the necessary additional surveys and tests and furnish copies to the Engineer and the <br />Contractor. If the Engineer finds that the results of such surveys or tests indicate subsurface or latent <br />physical conditions differing significantly from those indicated in the Contract Documents, a Change <br />Order shall be issued incorporating the necessary revisions. <br />11.3 The Engineer will establish such general reference points as in his judgment will enable the <br />Contractor to proceed with the Work. The Contractor will be responsible for the layout cf the Work <br />and will protect and preserve the established reference points and will make no changes or relocations <br />without the prior written approval of the Owner and Engineer. He will report to the Engineer <br />whenever any reference point is lost or destroyed or requires relocation because of necessary changes <br />in grades or locations. The Contractor will replace and accurately relocate all reference points so lost, <br />destroyed or moved. <br />ARTICLE 12. Use of Premises <br />12.1 The Contractor will confine his equipment, the storage of materials and equipment and the <br />operations of his workmen to areas permitted by law, ordinances, permits or the requirements of the <br />Contract Documents, and shall not unreasonably encumber the premises with materials or equipment. <br />GC 11 <br />