My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 08/15/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 08/15/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:17:42 AM
Creation date
11/3/2011 8:33:54 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
08/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or the interpretation of or performance under the Contract Documents shall be referred initially to the <br />Engineer for decision, which the Engineer shall render in writing within a reasonable time. <br />ARTICLE 15. Shop Drawings and Samples <br />15.1 After checking and verifying all field measurements, the Contractor will submit to the <br />Engineer for approval, in accordance with the accepted schedule of Shop Drawing submissions, five <br />copies (or at the Engineer's option, one reproducible copy) of all Shop Drawings, which shall have <br />been checked by and stamped with the approval of the Contractor and identified as the Engineer may <br />require. The data shown on the Shop Drawings will be complete with respect to dimensions, design <br />criteria, materials of construction and the like to enable the Engineer to review the information as <br />required. <br />15.2 The Contractor will also submit to the Engineer for approval, with such promptness as to <br />cause no delay in Work, all samples required by the Contract Documents. All samples will have been <br />checked by and stamped with the approval of the Contractor, identified clearly as to material, <br />manufacturer, any pertinent catalog numbers and the use for which intended. <br />15.3 At the time of each submission, the Contractor will, in writing, call the Engineer's attention to <br />any deviations that the Shop Drawing or sample may have from the requirements of the Contract <br />Documents. <br />15.4 The Engineer will check and approve with reasonable promptness Shop Drawings and <br />samples; however, checking and approval shall be only for conformance with the design concept of <br />the Project and for compliance with the information given in the Contract Documents. The approval <br />of a separate item as such will not indicate approval of the assembly in which the item functions. The <br />Contractor will make any corrections required by the Engineer and will return the required number of <br />corrected copies of Shop Drawings and resubmit new samples until approved. The Contractor shall <br />direct specific attention in writing or on resubmitted Shop Drawings to revisions other than the <br />corrections called for by the Engineer on previous submissions. <br />15.5 No Work requiring a Shop Drawing or sample submission shall be commenced until the <br />submission has been approved by the Engineer. <br />15.6 The Engineer's approval of Shop Drawings or samples shall not relieve the Contractor from <br />his responsibility for any deviations from the requirements of the Contract Documents unless the <br />Contractor has in writing the Engineer's attention to such deviations at the time of submission and the <br />Engineer has given written approval to the specific deviation, nor shall any approval by the Engineer <br />relieve the Contractor from responsibility for errors or omissions in the Shop Drawings. <br />ARTICLE 16. Tests and Inspections <br />16.1 If the Contract Documents,laws, ordinances, rules, regulations or orders of any public <br />authority having jurisdiction require any Work to specifically be inspected, tested, or approved by <br />someone other than the Contractor, the Contractor will give the Engineer timely notice of readiness <br />thereof. The Contractor will give the Engineer the required certificates of inspection, testing or <br />GC 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.