My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 08/15/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 08/15/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:17:42 AM
Creation date
11/3/2011 8:33:54 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
08/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22.2 The Contract Time will be extended in an amount equal to time lost due to delays beyond the <br />control of the Contractor, if he makes a claim therefrom as provided in this Agreement. Such delays <br />shall include, but not be restricted to, acts or neglect by any separate Contractor employed by the <br />Owner, fires, floods, labor disputes, epidemics, abnormal weather conditions, or acts of God. <br />22.3 All time limits stated in the Contract Documents are of the essence of the Agreement. The <br />provisions of this Article shall not exclude recovery for damages (including compensation for <br />additional professional services) for delay by either party. <br />ARTICLE 23. Neglected Work <br />If the Contractor should neglect to prosecute the Work in accordance with the Contract Documents, <br />including any requirements of the progress schedule, the Owner, after five (5) Calendar Day's written <br />notice to the Contractor may, without prejudice to any other remedy, make good such deficiencies <br />and the cost thereof (including compensation for additional professional services) shall be charged <br />against the Contractor, in which case a Change Order shall be issued incorporating the necessary <br />revisions in the Contract Documents including an appropriate reduction in the Contract Price. If the <br />payments then or thereafter due to the Contractor are not sufficient to cover such amount, the <br />Contractor will pay the difference to the Owner. <br />ARTICLE 24. Warranty and Guarantee: Correction, Removal or Acceptance of Defective <br />Work <br />24.1 The Contractor warrants and guarantees to the Owner that all materials and equipment will be <br />new unless otherwise specified and that all Work will be of good quality and free from faults or <br />defects and in accordance with the requirements of the Contract Documents and of any inspections, <br />tests or approvals referred to elsewhere in the Contract Documents. All unsatisfactory Work, all <br />faulty or defective Work and all Work not conforming to the requirements of the Contract Documents <br />or of such inspections, tests or approvals shall be considered defective. Prompt notice of all defects <br />shall be given to the Contractor. All defective Work, whether or not in place, may be rejected. <br />24.2 If required by the Engineer, prior to approval of final payment, the Contractor will promptly <br />without cost to the Owner and as required by the Engineer, either correct any defective Work, <br />whether or not fabricated, installed or completed, or, if the Work has been rejected by the Engineer, <br />remove it from the Work site and replace it with non - defective Work. If the Contractor does not <br />correct such defective Work or remove and replace such rejected Work within a reasonable time, all <br />as required by written notice from the Eniineer, the Owner may have the deficiency corrected or the <br />rejected Work removed and replaced. All direct or indirect costs of such correction or removal and <br />replacement, including compensation for additional professional services shall be paid by the <br />Contractor, and an appropriate Change Order shall be issued deducting all such costs from the <br />Contract Price. The Contractor will also bear the expenses of making good all Work of others <br />destroyed or damaged by his correction, removal or replacement of his defective Work. <br />24.3 If, after the approval of final payment and prior to the expiration of one (1) year after the date <br />of Substantial Completion or such longer period of time as may be prescribed by law or by the terms <br />of any applicable special guarantee required by the Contract Documents, any Work is found to be <br />GC 18 <br />