Laserfiche WebLink
defective, the Contractor will, promptly, without cost to the Owner and in accordance with the <br />Owner's written instructions, either correct such defective Work, or, if it has been rejected by the <br />Owner, remove it from the Work site and replace it with non - defective Work. If the Contractor does <br />not promptly comply with the terms of such instructions, the Owner may have the defective Work <br />corrected or the rejected Work removed and replaced, and all direct and indirect costs of such <br />removal and replacement, including compensation for additional professional services, will be paid <br />by the Contractor. <br />24.4 If, instead of requiring correction or removal and replacement of defective Work, the Owner <br />(prior to approval of final payment) and also the Engineer prefer to accept it, he may do so. In such <br />case, if acceptance occurs prior to approval of final payment, a Change Order shall be issued <br />incorporating the necessary revisions in the Contract Documents, including appropriate reduction in <br />the Contract Price; or, if the acceptance occurs after approval of final payment, an appropriate amount <br />shall be paid by the Contractor. <br />ARTICLE 25. Application for Partial Payment <br />25.1 After the 20th day of the current calendar month, the Contractor shall submit to the Engineer a <br />detailed estimate of the amount earned for the separate portions of the Work, and request payment. <br />As used in this Article, the words "amount earned" means the value, on the date of the estimate for <br />partial payment, of the Work completed in accordance with the Contract Documents, and the value of <br />approved materials delivered to the Project site suitably stored and protected prior to incorporation <br />into the Work. If the Contractor's estimate of amount earned conforms with the Engineer's <br />evaluation, the Engineer will calculate the amount due the Contractor and make recommendation to <br />the Owner for payment. <br />25.2 After deducting the retain amounts and the amount of all previous partial payments made to <br />the Contractor, the amount earned as of the current month will be made payable to the Contractor <br />thirty (30) Calendar Days after the 20th day of the said calendar month. <br />25.3 The Contractor warrants and guarantees that title to all Work, materials and equipment <br />covered by an application for payment, will have passed to the Owner prior to the making of the <br />application for payment free and clear of all liens, claims, security interests and encumbrances <br />(hereafter in these General Conditions referred to as "liens "); and that no Work, materials or <br />equipment covered by an application for payment will have been acquired by the Contractor or by <br />any other person performing the Work at the Work site or furnishing materials and equipment for the <br />Project, subject to an agreement under which an interest therein or encumbrance thereon is retained <br />by the seller or otherwise imposed by the Contractor or such other person. <br />25.4 The Engineer will, within fifteen (15) Calendar Days after receipt of application for payment, <br />either indicate in writing his approval of payment and present the application to the Owner, or return <br />the application to the Contractor indicating in writing his reasons for refusing to approve payment. In <br />the latter case, the Contractor may make the necessary corrections and resubmit the application. The <br />Owner will pay the Contractor the amount approved by the Engineer and Owner. <br />GC 19 <br />