My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/18/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 10/18/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:18:29 AM
Creation date
11/3/2011 8:37:54 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LS' <br />LSA Design, Inc. Northwestern Building F r Sa <br />a I <br />219 North Second Street <br />Suite 302 <br />Minneapolis, MN 55401 <br />T. 612.339.8729 <br />F. 612.339.7433 <br />www.lsadesigninc.con, To: Brian Olson, Dir. Of Public Works <br />From: James B. Lasher <br />Planning Project: Ramsey Municipal Parking Facility Skyway Addition <br />Architecture Subject: Scope of Work and Fee Proposal for: <br />Urban Design Guardrail Enhancements at the Parking Deck <br />Date: August 26, 2011 <br />On August 25, 2011 we toured the Ramsey Municipal Parking Facility to review <br />enhancements that the City would like to make to selected areas of the deck. There are <br />basically three areas of work: <br />• Enclose all openings along the exterior openings on floors 2 and 3 and raise <br />guardrail height on top floor at selected areas <br />• Enclose openings between floors at sloped ramp on all floors <br />• Provide sun screen protection on east side of parking deck at middle bay. <br />Based on our initial review of this work, we estimate that this Change Order will be <br />between $100,000 and $200,000 depending on the level of improvement and design <br />solutions. <br />The following is a series of Options on how to approach this issue and the fee's required <br />for each. <br />Option 1 — All Enhancements: <br />1. LSA will prepare two concepts to provide full enclosure at ALL openings within <br />the parking deck on floors two and three, including sun screen areas at center - <br />bay. <br />2. LSA will prepare two concepts to provide ornamental fencing on the top floor of <br />the deck at areas identified around the corners of the structure. <br />3. LSA will prepare two concepts to enclose or limit access to the openings <br />between floors along the center bays of the deck. <br />4. LSA will present concepts to city staff and work towards an agreeable Preferred <br />Alternative. <br />5. LSA will prepare sufficient details drawings to describe the work and submit as a <br />Request for Proposals to Knutson Construction for pricing. <br />6. LSA will review the quoted price with city staff and, if acceptable, prepare a <br />Change Order for the work. <br />7. LSA will submit the Change Order to the City and MnDOT for review and <br />approval. LSA will attend one City Council meeting to present the Change Order <br />for consideration. <br />8. LSA will review shop drawings and observe the work as part of the CA phase of <br />the Parking Deck project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.