My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/18/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 10/18/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:18:29 AM
Creation date
11/3/2011 8:37:54 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Option 1 Fee: <br />Schedule: <br />Option 2 — Limited Enhancements <br />$5,500 plus normal Reimbursable Expenses <br />3 to 5 weeks for Plans and Approvals <br />1. LSA will prepare two concepts to provide ornamental fence only at areas <br />identified on the top floor of the parking deck, including sun screen areas at <br />center bay. <br />2. LSA will prepare two concepts to provide additional height to the existing pipe <br />guardrails on floors two and three around the entire perimeter of the deck. (Note: <br />This will not provide full enclosure for the openings. We anticipate this design <br />will add up to 16" in height to the existing pipe guard rails.) <br />3. LSA will prepare one concept to enclose or limit access to the openings between <br />floors along the center bays of the deck. <br />4. LSA will present concepts to city staff and work towards an agreeable Preferred <br />Alternative. <br />5. LSA will prepare sufficient details drawings to describe the work and submit as a <br />Request for Proposals to Knutson Construction for pricing. <br />6. LSA will review the quoted price with city staff and, if acceptable, prepare a <br />Change Order for the work. <br />7. LSA will submit the Change Order to the City and MnDOT for review and <br />approval. LSA will attend one City Council meeting to present the Change Order <br />for consideration. <br />8. LSA will review shop drawings and observe the work as part of the CA phase of <br />the Parking Deck project. <br />Option 2: <br />Schedule: <br />$3,900 plus normal reimbursable expenses. <br />3-5 weeks for Plans and Approval <br />Please contact me with any further questions or comments. <br />C: William Fossing — LSA Design <br />File <br />2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.