Laserfiche WebLink
THIS AGREEMENT is dated as of the day of in the year 2012 by and between the CITY OF <br />RAMSEY, MINNESOTA (hereinafter called OWNER) and <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants set forth herein, agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />A. Regenerative sweeping in combination with Pickup Broom sweeping of city streets. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally <br />described as follows: <br />ARTICLE 3 - ENGINEER <br />3.01 The Project has been designed by the City Engineering Department who is hereinafter called ENGINEER <br />and who is to act as OWNER'S representative, assume all duties and responsibilities and have the rights <br />and authority assigned to ENGINEER in the Contract Documents in connection with completion of the <br />Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />EJCDC <br />FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR FOR <br />CONTRACT (STIPULATED PRICE) <br />4.03 Liquidated Damages <br />2012 STREET SWEEPING PROGRAM <br />CITY OF RAMSEY, MINNESOTA <br />CITY PROJECT NO. XXXXX <br />A. All time limits for Milestones, if any, and completion and readiness for final payment as stated in the <br />Contract Documents are of the essence of the Contract. <br />4.02 Dates for Completion and Final Payment <br />A. The Work by the initial Sweep will be completed on or before April 30, 2012. and ready for final payment in <br />accordance with Paragraph 14.07 of the General Conditions. <br />