Laserfiche WebLink
PART 1 GENERAL <br />1.01 SUMMARY <br />A. Section Includes: <br />1. Removal and disposal of: <br />D. Basis of Payment: <br />Item <br />Remove Collected Materials <br />PART 2 PRODUCTS <br />Blank <br />PART 3 EXECUTION <br />3.01 LOCATION OF STORAGE MATERIAL <br />SECTION 02074 <br />REMOVING MATERIALS <br />a. Collected Materials <br />B. Method of Measurement: <br />1. Measurement by Lump Sum <br />a. Measure all required procedures and equipment on a lump sum basis. <br />b. No measurement will be made for individual items or equipment. <br />c. Procedural and equipment revisions resulting from minor changes or field <br />adjustments will be considered incidental. <br />d. The unit price shall not be adjusted regardless of the final measurement of <br />material. <br />1. The excess material shall become the property of the CONTRACTOR for disposal <br />without exception. <br />2. Removal of collected debris includes all sweeping from sweeping operation. This <br />includes all provisions for collection, transfer, sifting of major debris, transportation out <br />of city limits, proper disposal in an environmentally legal and safe manner, clean up of <br />transfer stations and supervision of crews. <br />3. Payment for removal of items will be based on the following schedule: <br />Unit <br />L.S. <br />A. Temporary storage of collected materials will be provided at the Public Works Facility 14100 <br />Jaspar St <br />END OF SECTION <br />02074 - 1 <br />