My WebLink
|
Help
|
About
|
Sign Out
Home
02/01/94
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1994
>
02/01/94
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:28:11 AM
Creation date
10/20/2003 10:49:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
02/01/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9) <br /> <br />10) <br /> <br />12) <br /> <br />13) <br /> <br />14) <br /> <br />!5) <br /> <br />16) <br /> <br />17) <br /> <br />18) <br /> <br />19) <br /> <br />2O) <br /> <br />m) <br /> <br />2_? <br /> <br />acquisition system and control room. Thc equipment will utitizc thc landfill gas <br />currently generated by thc tandffll to demonstrate thc potential use ir, generating <br />electricity. Thc equipment has redundant safety features including automatic shut- <br />down procedures. <br /> <br />The test facility will also include two (2) temporarT mobile structures to provide <br />office and bathroom facilities for project personnel. <br /> <br />That the Applicant has indicated that at the conclusion of the test demonstration, the <br />structure will b¢ removed from the Site and the equipment will be transported to <br />mnother project site not within the City limit. <br /> <br />That the Applicant has indicated that zero'residue from the test operations will <br />remain on the Site; that all by-products are shipped out of state. <br /> <br />That no State or Count), perm/ts are required for the test demonstration facility. <br /> <br />That the permit being sought is for a period of one (l) year to accommodate site set- <br />up, 4,000 hours of demonsu-ation testing and site teardown. <br /> <br />That the property south and west of the Site is zoned Industrial and Residential to <br />the north and east. <br /> <br />That the test demonstrat/on facihty is proposed to be located approximately t,O00 <br />feet fi'om the nearest residential dwelling. <br /> <br />That materials and supplies required to support the demons='ation will be delivered <br />bv n-uck ro the Site utilizing the existing landfill entrance off Sunfish Lake Blvd. <br /> <br />That the Applicant has indicated that the test demonstration facility will ~ a 24 hour <br />a cia), operation. <br /> <br />That the Applicant has indicated that the methane gas extracted from the landr5.11 <br />during the rest demonstration will not impact the flow of gas necessary for the <br />power supply to Waltek, Inc. <br /> <br />That the Applicant has indicated that the noise factor assc~.iated with the operational <br />characteristics of the tand.f'fll gas/fuel cell system will be lower than the noise level <br />of the existing blowers located at the site as part of the =m-oundwater n-eatrnent <br />facilitf'. <br /> <br />That the Applicant has indicated that the odor factor will be less than current <br />existing odors at the Site for the following reasons: <br /> <br />a) <br /> <br />the demonsn-ation project will utilize the land_f'fll gas flow prior to the <br />existing flaring process; and <br /> <br />b) <br /> <br />the gas will be introduced into a clean-up process system prior to <br />introduction into the fuel cell. <br /> <br />That the additional n'affic generated by the proposed use does not appear to be <br />sign/ficant and would include supply services, operating personnel and visitors <br />during normal operations. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.