Laserfiche WebLink
9) <br /> <br />10) <br /> <br />12) <br /> <br />13) <br /> <br />14) <br /> <br />!5) <br /> <br />16) <br /> <br />17) <br /> <br />18) <br /> <br />19) <br /> <br />2O) <br /> <br />m) <br /> <br />2_? <br /> <br />acquisition system and control room. Thc equipment will utitizc thc landfill gas <br />currently generated by thc tandffll to demonstrate thc potential use ir, generating <br />electricity. Thc equipment has redundant safety features including automatic shut- <br />down procedures. <br /> <br />The test facility will also include two (2) temporarT mobile structures to provide <br />office and bathroom facilities for project personnel. <br /> <br />That the Applicant has indicated that at the conclusion of the test demonstration, the <br />structure will b¢ removed from the Site and the equipment will be transported to <br />mnother project site not within the City limit. <br /> <br />That the Applicant has indicated that zero'residue from the test operations will <br />remain on the Site; that all by-products are shipped out of state. <br /> <br />That no State or Count), perm/ts are required for the test demonstration facility. <br /> <br />That the permit being sought is for a period of one (l) year to accommodate site set- <br />up, 4,000 hours of demonsu-ation testing and site teardown. <br /> <br />That the property south and west of the Site is zoned Industrial and Residential to <br />the north and east. <br /> <br />That the test demonstrat/on facihty is proposed to be located approximately t,O00 <br />feet fi'om the nearest residential dwelling. <br /> <br />That materials and supplies required to support the demons='ation will be delivered <br />bv n-uck ro the Site utilizing the existing landfill entrance off Sunfish Lake Blvd. <br /> <br />That the Applicant has indicated that the test demonstration facility will ~ a 24 hour <br />a cia), operation. <br /> <br />That the Applicant has indicated that the methane gas extracted from the landr5.11 <br />during the rest demonstration will not impact the flow of gas necessary for the <br />power supply to Waltek, Inc. <br /> <br />That the Applicant has indicated that the noise factor assc~.iated with the operational <br />characteristics of the tand.f'fll gas/fuel cell system will be lower than the noise level <br />of the existing blowers located at the site as part of the =m-oundwater n-eatrnent <br />facilitf'. <br /> <br />That the Applicant has indicated that the odor factor will be less than current <br />existing odors at the Site for the following reasons: <br /> <br />a) <br /> <br />the demonsn-ation project will utilize the land_f'fll gas flow prior to the <br />existing flaring process; and <br /> <br />b) <br /> <br />the gas will be introduced into a clean-up process system prior to <br />introduction into the fuel cell. <br /> <br />That the additional n'affic generated by the proposed use does not appear to be <br />sign/ficant and would include supply services, operating personnel and visitors <br />during normal operations. <br /> <br /> <br />