Laserfiche WebLink
OPINION OF PROBABLE COST <br />CSAH 83 (ARMSTRONG BLVD) AT SUNWOOD DR <br />WSB Project: CSAH 83 at Sunwood Dr <br />Project Location: Ramsey, MN <br />WSB Project No: 01973-010 <br />PROJECT <br />TOTAL <br />ITEM Unit ESTIMATED Estimated <br />NUMBER DESCRIPTION UNIT Price QUANTITY Cost <br />Storm Sewer Improvements <br />2501.515 24" RC PIPE APRON EACH $625.00 3 $1,875.00 <br />2501.602 TRASH GUARD FOR 24" PIPE APRON EACH $350.00 3 $1,050.00 <br />2503.541 15" RC PIPE SEWER DESIGN 3006 CL V LIN FT $27.00 564 $15,228.00 <br />2503.541 18" RC PIPE SEWER DESIGN 3006 CL III LIN FT $28.00 297 $8,316.00 <br />2503.541 21" RC PIPE SEWER DESIGN 3006 CL III LIN FT $32.00 188 $6,016.00 <br />2503.541 24" RC PIPE SEWER DESIGN 3006 CL III LIN FT $38.00 650 $24,700.00 <br />2506.501 CONST DRAINAGE STRUCTURE DESIGN SD-48 LIN FT $325.00 108 $35,100.00 <br />2506.501 CONST DRAINAGE STRUCTURE DES 48-4020 LIN FT $400.00 22 $8,800.00 <br />2506.516 CASTING ASSEMBLY EACH $900.00 24 $21,600.00 <br />2506.522 ADJUST FRAME & RING CASTING EACH $275.00 3 $825.00 <br />2511.515 GEOTEXTILE FILTER TYPE IV SQ YD $3.00 25 $75.00 <br />2511.607 RANDOM RIPRAP CLASS III SPECIAL CU YD $150.00 20 $3,000.00 <br />Total Storm Sewer Improvements $126,585.00 <br />plus 10% Contingencies $12,658.50 <br />Total Storm Sewer Construction Cost $139,243.50 <br />plus 21%Admin, Legal Etc $29,241.14 <br />Total Storm Sewer Improvement Cost $168,484.64 <br />Preliminary Cost Estimate - Armstrong at Sunwood Report - 12-8.xls 3 12/8/2011 <br />