My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 12/13/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 12/13/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:18:57 AM
Creation date
12/8/2011 4:06:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
12/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPINION OF PROBABLE COST <br />CSAH 83 (ARMSTRONG BLVD) AT SUNWOOD DR <br />WSB Project: CSAH 83 at Sunwood Dr <br />Project Location: Ramsey, MN <br />WSB Project No: 01973-010 <br />ITEM <br />NUMBER <br />DESCRIPTION <br />PROJECT <br />TOTAL <br />Unit ESTIMATED Estimated <br />UNIT Price QUANTITY Cost <br />WATER MAIN IMPROVEMENTS <br />2504.602 CONNECT TO EXISTING WATER MAIN EACH $850.00 1 $850.00 <br />2504.602 HYDRANT EACH $3,300.00 2 $6,600.00 <br />2504.602 ADJUST VALVE BOX -WATER EACH $250.00 4 $1,000.00 <br />2504.602 6" GATE VALVE AND BOX EACH $1,200.00 2 $2,400.00 <br />2504.602 12" GATE VALVE AND BOX EACH $2,500.00 2 $5,000.00 <br />2504.603 6" WATER MAIN -DUCT IRON CL 52 LIN ET $45.00 60 $2,700.00 <br />2504.603 12" WATER MAIN -DUCT IRON RESTRND JT LIN ET $62.00 145 $8,990.00 <br />2504.603 12" WATER MAIN -DUCT IRON CL 52 LIN ET $50.00 550 $27,500.00 <br />2504.603 24" STEEL CASING PIPE LIN ET $140.00 145 $20,300.00 <br />2504.608 DUCTILE IRON FITTINGS POUND $3.00 1700 $5,100.00 <br />Total Storm Sewer Improvements $80,440.00 <br />plus 10% Contingencies $8,044.00 <br />Total Storm Sewer Construction Cost $68,484.00 <br />plus 21%Admin, Legal Etc $18,581.64 <br />Total Water Main Cost $107,065.64 <br />Grand Total $1,749,715.63 <br />Preliminary Cost Estimate - Armstrong at Sunwood Report - 12-8.xls 4 12/8/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.