Laserfiche WebLink
Executive Report: Summary (continued) <br />Scenario 2: Town Homes <br />IMP <br />• <br />• <br />• <br />Water Availability Charge $12,288 <br />Sewer Availability Charge <br />SAC handling Fee <br />r - Water Meter /Horn <br />Mechanical Permit <br />r - Plumbing Permit <br />SECTION TOTAL: $44,472.00* <br />*Cost does not reflect developer installed (DI) and assessed (ASSD) fees /charges. Actual <br />SECTION B: Blaine Coon Rapids Dayton Medina Elk River Cam <br />Storm Water Trunk DI <br />ASSD <br />ASSD <br />11 <br />Sewer Trunk <br />Water Trunk <br />Storm Water Management <br />Park Dedication (cash) <br />Trail Fees <br />Street /Traffic Signs <br />Future Seal Coating <br />Street Lights <br />SECTION TOTAL: <br />SECTION C: Blaine Coon Rapids Dayton Medina Elk River Cam <br />Top Soil <br />Grass /Sod <br />Trees Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />Y <br />Shrubs <br />Radon Barrier <br />Foundation Drainage <br />Certificate of Occupancy <br />Builder License <br />Base Building Permit Fee <br />Internal Plan Review Fee <br />City Sewer Connection <br />City Water Connection <br />$4,193 $16,000 <br />DI $3,500 <br />NA UTLY <br />$19,480 $16,000 <br />OT FE $4,200 <br />DI $400 <br />NA CTY <br />DI DI <br />$23,673* $40,100* <br />4" 4" <br />Yes <br />Yes <br />No <br />No <br />Yes <br />No <br />No <br />No <br />$14,160 <br />$2,400 <br />$5,510 <br />NA <br />$4,775 <br />OT FE <br />NA <br />NA <br />DI <br />$26,845* $97,200* <br />Yes <br />Yes <br />Yes <br />No <br />$16,600 <br />$52,600 <br />NA <br />6" 0" 4" <br />Yes <br />Yes <br />No <br />Yes <br />ASSD <br />ASSD <br />$2, <br />$2, <br />$38,546* $18 <br />Yes <br />Yes <br />Yes <br />Yes <br />Y <br />Y <br />Y <br />Y <br />SECTION D: Blaine Coon Rapids Dayton Medina Elk River Cam <br />NA <br />NA NA $24,000 $1 <br />N <br />UTLY $1,179 N <br />$28,000 $29,112 $12 <br />NA DI N <br />DI DI $2 <br />NA $800 $2 <br />DI $7,455 $5 <br />NA: Not applicable /No answer ASSD: Assessed based on actual construction cost <br />DI: Developer installed OT FE: Accounted for in other fee <br />UTLY: Paid for through utilities CITY: City Responsibility <br />*Cost does not reflect developer installed (DI) and assessed (ASSD) <br />3 <br />1 <br />$80 $800 NA NA NA N <br />NA NA $80 NA $40 $ <br />$9,384 $9,384 $10,298 $8,296 $9,294 $9 <br />$2,080 $6,100 NA $5,400 $6,041 $6,1 <br />OT FE $800 $1,200 $800 $520 $4 <br />DI $800 $1,200 $800 NA $4 <br />$17,840 $17,840 $21,400 $17,840 $33,608 $18 <br />NA $400 NA NA NA N <br />NA $2,400 $2,414 $3,360 $560 $2,. <br />$1,200 $1,347 $1,600 $1,600 $1,020 $5 <br />$1,600 $998 $1,600 $1,760 $840 $1,. <br />$40,868.60 $39,792.00 $39,856.00 $75,923.12 $39,9 <br />GRAND TOTAL: $68,145.00* $80,968.60* $66,637.00* $137,056.00* $114,469.12* $58,3: <br />f <br />