Laserfiche WebLink
Executive Report: Summary (continued) <br />Scenario 3: Apartment Building <br />Storm Water Management <br />*Cost does not reflect developer installed (DI) and assessed (ASSD) fees /charges. Ac <br />SECTION B: Blaine Coon Rapids Dayton Medina Elk River Ca <br />Sewer Trunk <br />Water Trunk <br />Storm Water Trunk <br />Park Dedication (cash) <br />Trail Fees <br />Street /Traffic Signs <br />Future Seal Coating <br />Street Lights <br />SECTION TOTAL: <br />$36,898 $35,200 <br />DI $30,800 $36,000 $789,000 <br />ASSD <br />$: <br />DI <br />ASSD $48,488 <br />NA ASSD <br />NA <br />UTLY <br />NA <br />UTLY <br />$10,375 <br />$292,200 <br />OT FE <br />$12,000 OT FE <br />NA <br />DI <br />DI <br />NA <br />CTY NA <br />NA <br />$1,600 <br />DI <br />$329,098* $241,600* <br />SECTION C: Blaine Coon Rapids Dayton Medina Elk River Ca <br />Top Soil <br />Grass /Sod <br />Trees <br />Shrubs <br />Radon Barrier <br />Foundation Drainage <br />Certificate of Occupancy <br />Builder License <br />Base Building Permit Fee <br />Internal Plan Review Fee <br />City Sewer Connection <br />City Water Connection <br />Water Availability Charge <br />Sewer Availability Charge <br />SAC handling Fee <br />Water Meter /Horn <br />Mechanical Permit <br />Plumbing Permit <br />4" 4" 6" <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />No <br />Yes <br />Yes <br />No <br />No <br />SECTION D: Blaine Coon Rapids Dayton Medina Elk River Ca <br />$1,200 <br />NA <br />NA <br />$10 <br />NA <br />$5 <br />NA $47,270 $70,565 $31,932 <br />NA $30,726 NA $20,726 <br />OT FE $12,000 $18,000 NA <br />$184,320 NA <br />NA NA $360,000 $ <br />$267,600 $267,600 <br />$321,000 $267,600 <br />NA <br />$163,200 $42,020 <br />$400 NA <br />DI <br />No <br />No <br />$2,364 <br />$212,400 $249,000 <br />DI <br />Yes <br />No <br />NA <br />$49,280 <br />DI <br />DI <br />$338,908* $1,087,280* <br />No <br />Yes <br />NA <br />ASSD S1 <br />$436,680 $1! <br />$5,964 <br />0" 4" <br />$72,000 NA NA NA <br />$454,619* $23 <br />Yes <br />Yes <br />NA <br />2 <br />NA $1,200 $302 NA $3,305 <br />NA $20,000 $24,000 $5,465 $9,000 $1 <br />NA <br />$14,400 $24,000 $3,939 $6,000 $7 <br />NA: Not applicable /No answer ASSD: Assessed based on actual construction cost <br />DI: Developer installed OT FE: Accounted for in other fee <br />UTLY: Paid for through utilities CITY: City Responsibility <br />*Cost does not reflect developer installed (DI) and assessed (ASSD) f <br />DI $ <br />$41,379 $4 <br />$26,896 $2 <br />$7,800 $E <br />DI $12,000 $18,000 NA NA $E <br />$504,120 $27 <br />SECTION TOTAL: $453,120.00* $479,559.00 $475,876.73 $11,341.50 $958,504.94 $407 <br />GRAND TOTAL: $782,218.00* $721,159.00* $814,784.73* $1,416,941.50* $1,413,124.14* $640, <br />