My WebLink
|
Help
|
About
|
Sign Out
Home
12/06/94
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1994
>
12/06/94
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:32:38 AM
Creation date
10/21/2003 7:46:11 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
12/06/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T)-pically, the~ ar= vehicles and/or memhandise or invcmory parked or stor~ along the <br />west side of the building. Ba~ed on this use of the property, the applicant should amend <br />the site plan to provide for a paved and curb~ row of parking along the west side of the <br />building. <br /> <br />City Code requires the outer perimeter of ail pavement to be finished with B-612 <br />continuous concrete curbing. The site plan proposes to install curbing along the south and <br />east edges of the pavement. Staff is recommending a waver of curb and gutter from the <br />western edge of the bituminous as it is anticipated that the vacant lots to the west will be <br />developed with continuous blacktop up to the building fronts. <br /> <br />~ The site is relatively fiat and substantially lower than the roadway of Highway <br />#10 N.W. Approximate}y 0.2 acres will be impervious. There is no public drainage <br />conduit to conduct runoff from the property, and consequently all drainage must be <br />accommodated on site. h is recommended that a swale be constructed from the ',,,,est edl2e <br />of the pavement to convey drainage to a sump area which could be located to the west or <br />north of the pawn shop. A sump having a capacity of 3,000 cubic feet would provide <br />sufficient storage to accommodate runoff from a four inch precipitation event. This volume <br />could be achieved by a 3 foot sump constructed 30 feet wide, placed behind the shop. <br /> <br />The Planning and Zoning Commission will be meeting at 7:30 p.m. on Tuesday, December 6, <br />1994, to consider your request for site plan approval. I suggest that you, or your representative, <br />be present at the meeting to answer any questions that may arise. <br /> <br />If you have any questions, please don't hesitate to cai1. <br /> <br />Respectfully, <br /> <br />CITY OF RAMSEY <br /> <br />Svtvia l::rolik <br />Z~ning Administrator <br /> <br />Steven Jankbwski <br />City Engineer <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.