Laserfiche WebLink
Section 9.50.50 is hereby repealed and amended to rmu:I ~ follows: <br /> <br /> Subdivision i. General conditions. Upon receipt of preliminary <br />approval of a plat by the City Council and prior to Council approval of the final plat, the <br />subdivider shall make provision in the manner hereinafter set forth for the installation, at <br />the sole expense of the subdivider, of such improvements as shall be required by the City, <br />which improvements may include, but are not limited to, streets, sidewaltcs, public water <br />systems, sanitary sewer systems, surface and storm drainage sTstems mad public utility <br />services. The installation of said improvements shall be in conformity with City approved <br />construction plans and specifications and all applicable City standards nd code sections. <br /> <br /> Subd. 2. Basic improvements required. <br /> <br /> Policy. It is hereby declared to be the policy of thc City to, as soon <br /> as practicable after approval of the proposed plat, require the <br /> installation of all of thc following improvements within thc <br /> subdivision: <br /> <br /> 1. Stage I Improvements: Major construction items needed to <br /> be constructed with a plat prior to issuance of any building <br /> permits: <br /> (a) Trunk Sanitary Sewer (Urban) <br /> (b) Trunk Watermai. n (Urban) <br /> (c) Trunk Storm Drainage FaciLities <br /> (d) <br /> (e) <br /> (f) <br /> (g) <br /> (h) <br /> (i) <br /> (J) <br /> (k) <br /> (I) <br /> (m) <br /> (n) <br /> <br /> 2. Stage II Improvements: Minor and rniscellaneous items <br /> required prior to acceptance by the City <br /> <br />(a) <br />(b) <br />(c) <br />(d) <br />(e) <br />(f) <br />(g) <br />(h) <br /> <br /> (when specified <br />Source and Storage (l::umre Water Facilities) <br />Lateral Sanitary Sewer (Urban) <br />Lateral Watermain turban).. <br />Lateral Storm Sewer and20r Ponding <br />Streets <br />Concrete Curb and Gutter (Urban) <br />Street Traffic Control Signs <br />Easement Acquisition <br />Lot Grading <br />Trail and Park Development <br />Street Lights <br /> <br />Inspection <br />Street Striping and Signing <br />Street Sweeping <br />Sidewalk (Optional) <br />Seal Coating (or escrow for) <br /> <br />Adjusting Water Shut-Off Boxes (Urban) <br /> <br />Ma/ntenance of Storm Water Sewer and Facilities <br />Boulevard Sodding <br /> <br /> <br />