My WebLink
|
Help
|
About
|
Sign Out
Home
06/09/94
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Economic Development Commission
>
Agendas
>
1994
>
06/09/94
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2025 2:49:13 PM
Creation date
10/21/2003 11:56:20 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Economic Development Commission
Document Date
06/09/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey <br /> PHONE (612) <br /> FAX (612) 427-5543 <br /> 151~3 NOWTHEN BOULEVARD N.W., RAMSEY, MINNESOTA 55303 · TDD (612) 42'/-8591 <br /> <br />Ma), 11, 1994 <br /> <br />19-32-25-23-0020 <br />George Cowles E <br />19731 Rush Sweet <br />Elk River MN, 55330 <br /> <br />RE: PROPOSED SERVICE ROAD <br /> <br />Dear Mr. Cowles:_ <br /> <br />The City is considering the possibility of constructing a service road along Highway #10 in the <br />location of 153rd ,Avenue N.W. As ~he attached map shows, this service road would allow for <br />better use of the {xisting properties and the possible creation of additional commercial lots for <br />development. On [the au_ached map, I have roughed in a possible location of the road in relation to <br />the existing buildings and proper-des. Keep in mind that this aliznment is very general and may be <br />changed depenmng upon input from the affected property owners. <br /> <br />The City has estirgated that the cost of this roadway will be between 240 and $50 per foot. This <br />inclu6es the costs for a 24 to 40 foot wide pavement, curb, gutter, and storm sewer improvements. <br />The City has estimated that the cost of right-of-way acquisition would be quite minimal, which <br />would ~eep this c~st closer to the lower end of the estimated range. This assumption is based <br />upon the acidifion~] value brought to the existing and newly created properties. Any funds used to <br />construct the roadway will have to be recovered through assessments or some other source. <br /> <br />You should review the proposed roadway. The City will be conducting an informational meeting <br />on Ma)' 26, 1994 it 6:00 p.m. This meeting will be at the Ramsey Municipal Center, located at <br />15153 Nowthen Boulevard N.W. Please contact me at 427-1410 with your thoughts and/or <br />concerns if you are~ unable to attend this meeting. <br /> <br />Sincerely, <br /> <br />Economic Devel6~ <br /> <br />i~n'rGoordinator <br /> <br />Ryan Schrogder. City Administrator <br />S~eve ] anke[wski, City Engineer <br />Sylvia FroliC, Zoning Administrator <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.