My WebLink
|
Help
|
About
|
Sign Out
Home
08/04/94
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Economic Development Commission
>
Agendas
>
1994
>
08/04/94
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2025 2:50:35 PM
Creation date
10/21/2003 12:01:20 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Economic Development Commission
Document Date
08/04/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Land southI of Hwy. 10 is predominantly designated Single Family Residential. Other areas <br />along the ~ghway also are proposed for more intense uses. An area east of Ramsey Blvd. <br />provides roi' High Density Residential. The area on the highway at Armstrong Blvd. is <br />designated ~ommercial to provides the new residential areas with retail services. <br /> <br />A frontage/~access road runs along the south side of Hwy. 10, providing access to the <br />residential ~d commercial areas. This eliminates the need for direct access on and offthe <br />highway an,cl reduces highway congestion. It is proposed that parkland be expanded to include <br />the HWY. lC/bridge road interchange. <br /> <br />In addition Io the frontage road along the highway, a collector road provides access to the <br />Single Family areas between HWY. 10 and the river. The area bounded by this residential <br />collector re~qmres more study. A s~ngle family res~denual designation ~s appropriate for the <br />present and 3he immediate future. However, as commercial uses and traffic are affected by a <br />bridge, the fieed for more community and regional retail uses and regional office uses would <br />need to be r <br /> evaluated. <br /> <br />Figure 6: ~qestern Brid~e Alignment, Alternative #1 <br /> <br />In this alte~ative, which arose during the planning process, the Mississippi River bridge would <br />be constructed south of Puma St. The bridge road would terminate at CR 116, the east-west <br />collector co ~r~necting TH 47 on the east and Hwy. 10 on the west. Traffic from the bridge <br />would be dissected either onto Hwy. 10 via a diamond inte!-change, or over the highway for <br />access to thg commercial and industrial uses along CR 116 to the east. CR 116 also acts as an <br />access road [o businesses west of Armstrong, which allows the elimination of direct access <br />onto Hwy. 1[0. However, CR 116 would be more a local collector west of the bridge road, <br />servicing th~_residential uses. Away from the Hwy. 10 corridor, Single Family Residential <br />dominates lard uses west of Armstrong. <br /> <br />East of the b~dge road, CR 116 serves as a divider between residential and non-residential land <br />uses, with Ngher density residential near the road. The area along Hwy. 10 east of the bridge <br />road is desighated Community Commercial. An Office/Business Park designation then follows <br />Hwy. 10 to limrnsey Blvd. <br /> <br />The area alorg Hwy. l0 east of Ramsey Blvd. and west of Sunfish Lake Blvd. is designated for <br />Highway CoCmercial uses. Two business access roads provide access to the businesses here <br />and within thf~ Business Warehouse and Industrial areas north of the tracks. The road between <br />the hig. hway ~d the tracks allows the elimination of direct access onto hwy. 10, reducing <br />highway congestion, while still providing good access to the businesses along the highway. <br /> <br />North of CR !I 16, Single Family Residential designation begins at the golf course and continues <br />east along th~; north side of 1.49th Ave. NE to the landfill site. Between 149th and CR 116 is <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.