My WebLink
|
Help
|
About
|
Sign Out
Home
08/04/94
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Economic Development Commission
>
Agendas
>
1994
>
08/04/94
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2025 2:50:35 PM
Creation date
10/21/2003 12:01:20 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Economic Development Commission
Document Date
08/04/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CR i I 6, Hwy. 10 Corridor and the Bridge <br /> <br />CR 116 is adjusted to the north between Ramsey and Armstrong Blvds. This allows larger <br />developable areas between CR 116 and Hwy. 10, particularly at Armstrong Blvd. and at the <br />bridge road terminus. Residential uses dominate, though significant areas are guided for <br />nonresidential activity along Hwy. 10, up to the proposed interchange with the new bridge <br />road. <br /> <br />This alternative also allocates more land to residential use south of HWY. 10. The access road <br />paralleling the highway allows a slightly larger area for commercial uses at the bridge road <br />interchange. No additional residential collector is shown closer to the river. <br /> <br />The specific land uses in the area of the bridge road would be adjusted over time to reflect <br />development needs for the City and its residents. The current need for residential land may <br />change over time, and nonresidential uses may be more advantageous at locations such as the <br />bridge road interchange with Hwy. 10 and with CR 116. <br /> <br />Additional Land Use Modifications Su~ested Outside of the Hwy. 10 Corridor <br /> <br />Alternatives in areas outside the Hwy. 10 corridor resulted fi.om discussions between staff and <br />the consultants. A map depicting the alternatives described below will be presented at the joint <br />meeting of the Planning Commission and City Council on July 6. <br /> <br />In the area of CR 116 and TH 47, land on the east side of Xkimo St. (south of 142nd) and its <br />cul-de-sac offers several options. The land could be left as part of River's Bend Park, as <br />shown in Figure 1, possibly offering a new entrance to the park, Alternatively, the land <br />aburting Xkimo could be an ideal site for senior housing. The site has direct access to retail <br />services, River's Bend Park, and could easily be integrated into the senior transportation <br />network serving Andover and Anoka. It is also possible that additional retail uses would find <br />the site a viable location. <br /> <br />Land on the west of the wetland and south of Ftintwood Hills is shown as nonresidential, as it <br />is currently zoned. This anticipates a =m'eater demand for commercial and retail uses around the <br />intersection provided Thurston Ave. is realigned. TNs is a change from Figure 1, which shows <br />the area as park and residential. <br /> <br />Land along 153rd Ave. NW between Nowthen and TH 47 is shown as nonresidential, as it is <br />currently zoned. However, the amount of nonresidential land is reduced somewhat, reflecting <br />the need for residential land and the recogrdtion that commercial development in the area has <br />not developed as anticipated. <br /> <br />Commercial nodes are suggested at several locations. They are intended to provide <br />neighborhood commercial activities to the developing residential areas. The connections <br /> <br />10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.