Laserfiche WebLink
LRT: <br /> <br />The Anoka County Comprehensive LRT System Plan was prepared in 1989, to identify LRT <br />alignment alternatives. Analysis in the Plan showed that the most feasible LRT line would <br />run between downtown Minneapolis and the Northtown Shopping Center, and that extension <br />of LRT further tO the north would not be feasible until 2010. <br /> <br />Alternative extensions from the Shopping Center would either go directly north along TH 65 <br />or northwest, g~nerally along TH 10. The extension along the TH 10 corridor would <br />terminate in Anc~ka near the TH 10/169 interchange. A further extension of the line along <br />TH 10 into and through Ramsey would not be feasible until after 2010. Feeder bus services <br />would be providc~d on TH 47 to transport LRT passengers to the LRT station along the TH <br />10 corridor. <br /> <br />Working Paper #1 <br />City of Ramsey Comprehensive Plan Update <br />Transportatkon Plan Element <br />Page 12 <br /> <br /> <br />