My WebLink
|
Help
|
About
|
Sign Out
Home
10/20/94
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Economic Development Commission
>
Agendas
>
1994
>
10/20/94
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2025 2:52:00 PM
Creation date
10/21/2003 12:04:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Economic Development Commission
Document Date
10/20/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LRT: <br /> <br />The Anoka County Comprehensive LRT System Plan was prepared in 1989, to identify LRT <br />alignment alternatives. Analysis in the Plan showed that the most feasible LRT line would <br />run between downtown Minneapolis and the Northtown Shopping Center, and that extension <br />of LRT further tO the north would not be feasible until 2010. <br /> <br />Alternative extensions from the Shopping Center would either go directly north along TH 65 <br />or northwest, g~nerally along TH 10. The extension along the TH 10 corridor would <br />terminate in Anc~ka near the TH 10/169 interchange. A further extension of the line along <br />TH 10 into and through Ramsey would not be feasible until after 2010. Feeder bus services <br />would be providc~d on TH 47 to transport LRT passengers to the LRT station along the TH <br />10 corridor. <br /> <br />Working Paper #1 <br />City of Ramsey Comprehensive Plan Update <br />Transportatkon Plan Element <br />Page 12 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.