My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 11/15/2011
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2010 - 2019
>
2011
>
Minutes - Public Works Committee - 11/15/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:16:57 PM
Creation date
1/11/2012 10:15:55 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
11/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember Elvig noted some costs can be deferred if the property owner has the ability to <br /> sell a lot. <br /> Public Works Director Olson noted it has already been discussed to defer the utility costs until <br /> connection and the City usually assesses 50% on the roads. <br /> Chairperson McGlone stated support for a 50% assessment. <br /> Councilmember Backous agreed. <br /> Councilmember Elvig stated in this case residents already have a bituminous road in front of <br /> them, though well over due for reconstruction, so it is not like a rebuild from a dirt street. <br /> Chairperson McGlone pointed out that 10 of the 12 property owners had previously signed to get <br /> the road so he thinks they are on board for a better road and will understand the benefit of <br /> subdividing. <br /> Councilmember Backous agreed with the logic of doing a 50/50 split on the costs, noting it <br /> would then cost $6,200 /property. <br /> City Engineer Himmer noted this mill and overlay does not contemplate removal of underlying <br /> soils. <br /> Councilmember Elvig stated support for the City to cover the cost of soil corrections since the <br /> road was not built correctly. <br /> City Engineer Himmer stated staff will meet with these residents to review this scenario and find <br /> out if it is palatable. Staff will also prepare a funding recommendation, noting the Enterprise <br /> Fund may cover part of it. <br /> Motion by Chairperson McGlone seconded by Councilmember Backous, to recommend that the <br /> City Council approve a Garnet Street roadway project of the same width as streets to the north <br /> including concrete curb and gutter, full utilities, and a sidewalk on the east side, a 50 %/50% cost <br /> split, assessment on the street portion only, and subgrade correction to be paid by City. <br /> Motion carried. Voting Yes: Chairperson McGlone and Councilmembers Backous and Elvig. <br /> Voting No: None. <br /> Case #7: Consider Authorization to Initiate Updates to the City's Comprehensive <br /> Sanitary Sewer and Water System Studies <br /> City Engineer Himmer reviewed the staff report. <br /> Councilmember Elvig commented on the size of this task. <br /> City Engineer Himmer estimated a cost of $25,000 and timeline of 8 weeks. <br /> Public Works Committee / November 15, 2011 <br /> Page 13 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.