Laserfiche WebLink
CC Regular Session 7. 6. <br />Meeting Date: 02/14/2012 <br />By: Brian Olson, Engineering/Public Works <br />Information <br />Title: <br />Consider Guard Rail Enhancements for the Parking Ramp <br />Background: <br />The parking ramp has been open for several years. The exterior railings for all floors were designed to be <br />functional and also appear as architectural elements. The north, east and south railings on the top floor are a <br />mixture of concrete and concrete topped with metal fence. The top of the metal fence is 9 feet above the floor with <br />the top of the concrete at the fence 66 inches above the floor. The lower concrete rails are 43 inches high. <br />The railing on the north, east and south sides of the 2nd and 3rd floors are concrete to 30 inches with metal railings <br />on top making the total height 43 inches. The west railings on all floors are cables to allow for the expansion that is <br />under construction. <br />The interior edges of the floors and ramps between floors have chain link fence over cables cast into the support <br />columns. The top of the chain link fence is 43 inches above the floor. There is an 18" gap between the horizontal <br />fence at the edge of the floor and the sloping fence at the edge of the ramps. <br />The heights of the railings and fences meet the current safety standards. <br />On October 18th, Staff was directed to amend the existing Contract with LSA Design to provide a design for the rail <br />enhancements that would be necessary to accommodate the original concern that was raised that the lower height <br />railings may not prevent a bicycle rider from striking the barrier and going over the top of the railing, or providing <br />a situation that children could climb or fall into open areas. <br />During the discussion at the October 18th, Staff was directed to contact our insurance carrier to see if there would <br />be any significant reduction of risk exposure, as reflected in premium reductions, if the City were to provide <br />additional protection on this facility. The League of Mn Cities, our insurance carrier, has indicated that there will <br />not be any reduction in our premium if we perform these enhancements <br />On January 17, 2012, the Public Works Committee met and discussed several aspects of the parking ramp, most of <br />which will be addressed by the City Council under the report from Public Works on the Consent agenda. The issue <br />of railing heights was one that Staff was directed to bring forward under separate case and that is the purpose of <br />this case. <br />There were two options that were designed and priced for the concern that was expressed about the 43 inch rail <br />heights. One added an extension on the top of the existing railing and the other completely enclosed the openings on <br />floors 2 and 3 and raised the guard rail height at specific locations on the top floor. Bill Fossing from LSA Design <br />was present at the meeting to present the designs and answer questions. The cost of these options are $147,658 and <br />$302,588 respectively. <br />It was the consensus of the Public Works Committee to get a price only for those areas that are only concrete on the <br />fourth floor. <br />Notification: <br />Observations: <br />