Laserfiche WebLink
• <br />ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATED <br />COST <br />1 <br />MOBILIZATION <br />LUMP SUM <br />$800.00 <br />1 <br />$800 <br />2 <br />CLEARING <br />TREE <br />$100.00 <br />12 <br />$1,200 <br />3 <br />GRUBBING <br />TREE <br />$100.00 <br />12 <br />$1,200 <br />4 <br />REMOVE STORM SEWER <br />LIN FT <br />$5.00 <br />_ <br />233 <br />$1,165 <br />5 <br />REMOVE CONCRETE CURB <br />r LIN FT <br />$10.00 <br />135 <br />$1,350 <br />6 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$5.00 <br />150 <br />$750 <br />7 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />$3.00 <br />155 <br />$465 <br />8 <br />- 4" <br />4" AGGREGATE BASE CLASS 5 <br />SQ YD <br />$7.50 <br />150 <br />$1,125 <br />9 <br />BITUMINOUS PATCH <br />SQ YD <br />$28.00 <br />150 <br />$4,200 <br />10 <br />BULKHEAD MANHOLE <br />EACH <br />$500.00 <br />1 <br />$500 <br />11 <br />18" RC PIPE APRON <br />EACH <br />$350.00 <br />1 <br />$350 <br />12 <br />TRASH GUARD FOR 18" PIPE APRON <br />EACH <br />$200.00 <br />1 <br />$200 <br />13 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />$1,000.00 <br />2 <br />$2,000 <br />14 <br />18" RC PIPE SEWER DESIGN 3006, CL III <br />LIN FT <br />$23.00 <br />267 <br />$6,141 <br />15 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 <br />EACH <br />$1,500.00 <br />1 <br />$1,500 <br />16 <br />CONCRETE CURB & GUTTER DESIGN B618 <br />LIN FT <br />$20.00 <br />135 <br />$2,700 <br />17 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$500.00 <br />1 <br />$500 <br />18 <br />CONIFEROUS TREE 4' HT B &B <br />TREE <br />$200.00 <br />12 <br />$2,400 <br />19 <br />TURF ESTABLISHMENT <br />ACRE <br />$1 ,500.00 <br />0.1 <br />$150 <br />TABLE 2 <br />148TH LANE <br />ALTERNATIVE 1B - 18" OUTLET <br />Estimated Construction Cost <br />Contingency (10 %) <br />Total Estimated Construction Cost <br />$28,696 <br />$2,870 <br />$31 ,566 <br />