My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/20/2012
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2012
>
Agenda - Public Works Committee - 03/20/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:20:02 AM
Creation date
3/16/2012 11:19:32 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/20/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATED <br />COST <br />1 <br />MOBILIZATION <br />LUMP SUM <br />$1 ,300.00 <br />1 <br />$1,300 <br />2 <br />CLEARING <br />TREE <br />$100,00 <br />12 <br />$1,200 <br />3 <br />GRUBBING <br />TREE <br />., <br />$100.00 <br />12 <br />$1,200 <br />4 <br />REMOVE STORM SEWER <br />LIN FT <br />$4.00 <br />388 <br />$1,552 <br />5 <br />REMOVE CONCRETE CURB <br />LIN FT <br />$5.00 <br />155 <br />$775 <br />6 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$5.00 <br />195 <br />$975 <br />7 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />$3.00 <br />175 <br />$525 <br />8 <br />4" AGGREGATE BASE CLASS 5 <br />SQ YD <br />$7.50 <br />195 <br />$1,463 <br />9 <br />4" BITUMINOUS PATCH <br />SQ YD <br />$28.00 <br />195 <br />$5,460 <br />10 <br />BULKHEAD MANHOLE <br />EACH <br />$500.00 <br />1 <br />$500 <br />11 <br />24" RC PIPE APRON <br />EACH <br />$450.00 <br />2 <br />$900 <br />12 <br />TRASH GUARD FOR 24" PIPE APRON <br />EACH <br />$300.00 <br />2 <br />$600 <br />13 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />$1,000.00 <br />1 <br />$1,000 <br />14 <br />24" RC PIPE SEWER DESIGN 3006, CL III <br />LIN FT <br />$29.00 <br />414 <br />$12,006 <br />15 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 <br />EACH <br />$1,500.00 <br />1 <br />$1,500 <br />16 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 - 4020 <br />LIN FT <br />$2,000,00 <br />2 <br />$4,000 <br />17 <br />CONCRETE CURB & GUTTER DESIGN B618 <br />LIN FT <br />$20.00 <br />155 <br />$3,100 <br />18 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$500.00 <br />1 <br />$500 <br />19 <br />CONIFEROUS TREE 4' HT B &B <br />TREE <br />$200.00 <br />12 <br />$2,400 <br />20 <br />TURF ESTABLISHMENT <br />ACRE <br />$1 ,500,00 <br />0.2 <br />$300 <br />TABLE 3 <br />1 48TH LANE <br />ALTERNATIVE 1C - 24" OUTLET <br />Estimated Construction Cost <br />Contingency (10 %) <br />Total Estimated Construction Cost <br />$41,256 <br />$4,126 <br />$45,381 <br />
The URL can be used to link to this page
Your browser does not support the video tag.