Laserfiche WebLink
ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATED <br />COST <br />1 <br />MOBILIZATION <br />LUMP SUM <br />$800.00 <br />1 <br />$800 <br />2 <br />REMOVE STORM STRUCTURE <br />EACH <br />$400.00 <br />1 <br />$400 <br />3 <br />15" RC PIPE APRON <br />EACH <br />$300.00 <br />1 <br />$300 <br />4 <br />24" RC PIPE APRON <br />EACH <br />$450.00 <br />2 <br />$900 <br />5 <br />24" RC PIPE SEWER DESIGN 3006, CL V - JACKED <br />_ <br />LIN FT <br />$200.00 <br />118 <br />$23,600 <br />6 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />$300.00 <br />1 <br />$300 <br />7 <br />TURF ESTABLISHMENT <br />LUMP SUM <br />$100.00 <br />1 <br />T $100 <br />TABLE 13 <br />149TH LANE <br />ALTERNATIVE 3B - 24" OUTLET <br />Estimated Construction Cost <br />Contingency (10 %) <br />Total Estimated Construction Cost <br />$26,400 <br />$2,640 <br />$29,040 <br />