Laserfiche WebLink
ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATED <br />COST <br />1 <br />MOBILIZATION <br />LUMP SUM <br />$100.00 <br />1 <br />$100 <br />COMMON EXCAVATION <br />CU YD <br />$5.00 <br />133 <br />$665 <br />3 <br />GRANULAR BORROW <br />CU YD <br />$8.00 <br />380 <br />$3,040 <br />4 <br />TURF ESTABLISHMENT <br />ACRE <br />$1,500.00 <br />0.3 <br />$450 <br />TABLE 14 <br />149TH LANE <br />ALTERNATIVE 4 <br />Estimated Construction Cost <br />Contingency (1O %) <br />Total Estimated Construction Cost <br />$4,255 <br />$426 <br />$4,681 <br />