Laserfiche WebLink
ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATED <br />COST <br />1 <br />MOBILIZATION <br />LUMP SUM <br />$1,900.00 <br />1 <br />$1 ,900 <br />2 <br />CLEARING <br />ACRE <br />$1,500.00 <br />2.35 <br />$3,525 <br />3 <br />GRUBBING <br />ACRE <br />$1,500.00 <br />2.35 <br />$3,525 <br />4 <br />COMMON EXCAVATION <br />CU YD <br />$5.00 <br />10123 <br />$50,615 <br />5 <br />ADJUST SEWER MANHOLES <br />LUMP SUM <br />$4,000.00 <br />1 <br />$4,000 <br />6 <br />ADJUST SEWER CLEANOUTS <br />LUMP SUM <br />$500.00 <br />1 <br />$500 <br />7 <br />REINSTALL SPRINKLER SYSTEM <br />LUMP SUM <br />$1,000.00 <br />1 <br />$1,000 <br />8 <br />TURF ESTABLISHMENT <br />ACRE <br />$1 ,500.00 <br />2.9 <br />$4,275 <br />TABLE 23 <br />156TH LANE <br />ALTERNATIVE 2 <br />Estimated Construction Cost <br />Contingency (10 %) <br />Total Estimated Construction Cost <br />$69,340 <br />$6,934 <br />$76,274 <br />