Laserfiche WebLink
ITEM <br />NO. _ <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATED <br />COST <br />1 <br />MOBILIZATION <br />LUMP SUM <br />$4,200.00 <br />1 <br />$4,200 <br />2 <br />SALVAGE STORM SEWER <br />LIN FT <br />$20.00 <br />72 <br />$1440 <br />3 <br />REMOVE MANHOLE <br />EACH <br />$500.00 <br />- 1 <br />$500 <br />4 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$2.00 <br />3,290 <br />$6,580 <br />5 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />$3.00 <br />100 <br />$300 <br />6 <br />4" AGGREGATE BASE CLASS 5 <br />SQ YD <br />$7.00 <br />3,290 <br />$23,030 <br />7 <br />4" BITUMINOUS PAVEMENT <br />SQ YD <br />$21.00 <br />3,290 <br />$69,090 <br />8 <br />BITUMINOUS CURB <br />LIN FT <br />$3.00 <br />1,850 <br />$5,550 <br />9 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />$1,000.00 <br />2 <br />$2,000 <br />10 <br />12" RC PIPE SEWER DESIGN 3006, CL V <br />LIN FT <br />$22.00 <br />925 <br />$20,350 <br />11 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 <br />EACH <br />$2,000.00 <br />3 <br />$6,000 <br />12 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$5,000.00 <br />1 <br />$5,000 <br />13 <br />TURF ESTABLISHMENT <br />ACRE <br />$1,500.00 <br />0.1 <br />$150 <br />TABLE 24 <br />156TH LANE <br />ALTERNATIVE 3 <br />Estimated Construction Cost $144,190 <br />Contingency (10 %) $14,419 <br />Total Estimated Construction Cost $158,609 <br />