Laserfiche WebLink
ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATED <br />COST <br />1 <br />MOBILIZATION <br />LUMP SUM <br />$1,000.00 <br />1 <br />$1 ,000 <br />2 <br />SALVAGE STORM SEWER <br />LIN FT <br />$20.00 <br />120 <br />$2,400 <br />3 <br />REMOVE CONCRETE CURB <br />LIN FT <br />$-10.00 <br />60 <br />$600 <br />4 <br />REMOVE MANHOLE <br />EACH <br />$500.00 <br />1 <br />$500 <br />5 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$5.00 <br />110 <br />$550 <br />6 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) A <br />LIN FT <br />$3.00 <br />70 <br />_ <br />$210 <br />7 <br />4" AGGREGATE BASE CLASS 5 <br />SQ YD <br />$7.50 <br />110 <br />$825 <br />8 <br />4" BITUMINOUS PAVEMENT <br />SQ YD <br />$28.00 <br />110 <br />$3,080 <br />9 <br />18" RC PIPE APRON <br />EACH <br />$350.00 <br />1 <br />$350 <br />10 <br />TRASH GUARD FOR 18" PIPE APRON <br />EACH <br />$200.00 <br />1 <br />$200 <br />11 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />$1,000.00 <br />1 <br />$1,000 <br />12 <br />18" RC PIPE SEWER DESIGN 3006, CL 111 <br />LIN FT <br />$23.00 <br />735 <br />$16,905 <br />13 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 <br />EACH <br />$1,500.00 <br />2 <br />$3,000 <br />14 <br />CONCRETE CURB AND GUTTER DESIGN B618 <br />LIN FT <br />$20.00 <br />60 <br />$1 ,200 <br />15 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$2,000.00 <br />1 <br />$2,000 <br />16 <br />TURF ESTABLISHMENT <br />ACRE <br />$1,500.00 <br />0.3 <br />$450 <br />TABLE 25 <br />156TH LANE <br />ALTERNATIVE 4 <br />Estimated Construction Cost <br />Contingency (1O %) <br />Total Estimated Construction Cost <br />$34,270 <br />$3,427 <br />$37,697 <br />