Laserfiche WebLink
ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATED <br />COST <br />1 <br />MOBILIZATION <br />LUMP SUM <br />$3,750.00 <br />1 <br />$3,750 <br />2 <br />REMOVE STORM SEWER - <br />LIN FT <br />$4.00 <br />72 <br />$288 <br />3 <br />BULKHEAD MANHOLE <br />EACH <br />$500.00 <br />1 <br />$500 <br />4 <br />36" METAL APRON <br />EACH <br />$325.00 <br />1 <br />$325 <br />5 <br />36" RC PIPE APRON <br />EACH <br />$450.00 <br />1 <br />$450 <br />6 <br />TRASH GUARD FOR 36" PIPE APRON <br />EACH <br />$400.00 <br />1 <br />$400 <br />7 <br />36" RC PIPE SEWER DESIGN 3006, CL III <br />LIN FT <br />$38.00 <br />110 <br />$4,180 <br />8 <br />36" HDPE PIPE SEWER (DIRECTIONALLY DRILLED) <br />LIN FT <br />$280.00 <br />420 <br />$117,600 <br />9 <br />DRAINAGE STRUCTURE DESIGN 60 - 4020 <br />LIN FT <br />$2,000.00 <br />1 <br />$2,000 <br />10 <br />_CONSTRUCT <br />TURF ESTABLISHMENT <br />ACRE <br />$1,500.00 <br />0.2 <br />$300 <br />TABLE 26 <br />156TH LANE <br />ALTERNATIVE 5 <br />Estimated Construction Cost <br />Contingency (10 %) <br />Total Estimated Construction Cost <br />$1 29,793 <br />$1 2,979 <br />$142,772 <br />