Laserfiche WebLink
HRA Regular Session 5. 6. <br />Meeting Date: 04/24/2012 <br />By: Darren Lazan, Housing & <br />Redevelopment Authority <br />Title: <br />Consider Temporary Walkway Options - Sunwood Drive <br />Background: <br />As part of the developers responsibilities, Flaherty and Collins must maintain continuous access and connectivity <br />for pedestrians along Sunwood Drive during construction. This can be accomplished in a number of ways, but the <br />most efficient seems to be the installation of a temporary bituminous trail on the North side of the street. <br />Pedestrians westbound would cross at city hall and continue along the north side of the road until past the F &C <br />construction site, then cross back to the permanent walkway. The existing walk between these two points would be <br />closed for approximately 12 months. <br />The question for consideration by the HRA relates to one of timing for the permanent improvements on the north <br />side of Sunwood. There has been considerable discussion in the last several months about finishing the streetscape <br />on the north side of Sunwood from Rhinestone west to Armstrong. The primary concern in waiting would be the <br />disproportionate growth of boulevard trees, and the long term look of Sunwood Drive if this is not consistent. <br />As part of the Sunwood realignment, permanent streetscape is proposed from Zeolite west to Armstrong. As part of <br />the current grant request, permanent streetscape is proposed fronting the future Municipal Plaza on the south and <br />east sides. If this grant is approved, this would leave only two small segments unfinished in the near future. <br />Notification: <br />Observations: <br />The Development Team would like the HRA's direction on the concept of completing the remainder of the <br />streetscape on the North side of Sunwood. If acceptable, we would like to work with F &C to contribute the cost of <br />the bituminous trail toward the permanent solution, then develop a plan and feasibility study to complete the <br />remaining work. We have not priced this effort at this time, as we wanted to get HRA direction before proceeding. <br />Recommendation: <br />The development team recommends the HRA discuss the possibility of completing the Sunwood Streetscaping, and <br />if appropriate, direct the team to prepare a feasibility study to complete the improvements, and work with F &C to <br />coordinate this effort. <br />Funding Source: <br />COR Revolving Fund (current balance $5,171) and F &C proceeds. <br />Council Action: <br />Provide consensus direction to the development team with regards to the completion of the Sunwood streetscape. <br />Walkway Exhibit <br />Attachments <br />