Laserfiche WebLink
ITEM <br />NO. DESCRIPTION <br />1 MOBILIZATION <br />2 REMOVE STORM STRUCTURE <br />3 15" RC PIPE APRON <br />4 CONNECT TO EXISTING STORM SEWER <br />5 TURF ESTABLISHMENT <br />TABLE 8 <br />149TH LANE <br />ALTERNATIVE 1 <br />UNIT <br />LUMP SUM <br />EACH <br />EACH <br />EACH <br />LUMP SUM <br />UNIT <br />COST <br />$1 00.00 <br />$400.00 <br />$300.00 <br />$300.00 <br />$50.00 <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />1 <br />1 <br />1 <br />1 <br />1 <br />Estimated Construction Cost <br />Contingency (10%) <br />Total Estimated Construction Cost <br />TOTAL <br />ESTIMATED <br />COST <br />$100 <br />$400 <br />$300 <br />$300 <br />$50 <br />$1,150 <br />$115 <br />$1,265 <br />