Laserfiche WebLink
ITEM <br />NO. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />TABLE 9 <br />149TH LANE <br />ALTERNATIVE 2A - 15" OUTLET <br />DESCRIPTION <br />MOBILIZATION <br />REMOVE STORM STRUCTURE <br />15" RC PIPE APRON <br />15" RC PIPE SEWER DESIGN 3006, CL V - JACKEā‘ <br />CONNECT TO EXISTING STORM SEWER <br />TURF ESTABLISHMENT <br />UNIT <br />LUMP SUM <br />EACH <br />EACH <br />LIN FT <br />EACH <br />LUMP SUM <br />UNIT <br />COST <br />$400.00 <br />$400.00 <br />$300.00 <br />$100.00 <br />$300.00 <br />$100.00 <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />1 <br />1 <br />3 <br />118 <br />1 <br />1 <br />Estimated Construction Cost <br />Contingency (10%) <br />Total Estimated Construction Cost <br />TOTAL <br />ESTIMATED <br />COST <br />$400 <br />$400 <br />$900 <br />$11,800 <br />$300 <br />$100 <br />$13,900 <br />$1,390 <br />$15,290 <br />