My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/15/2012
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2012
>
Agenda - Public Works Committee - 05/15/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:20:52 AM
Creation date
5/11/2012 4:08:19 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/15/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM <br />NO. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />TABLE 16 <br />RUM RIVER HILLS GOLF CLUB <br />CART PATH FLOODING NEAR CLUBHOUSE - NEW CULVERTS <br />DESCRIPTION <br />MOBILIZATION <br />REMOVE STORM SEWER <br />REMOVE BITUMINOUS PAVEMENT <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />4" AGGREGATE BASE CLASS 5 <br />4" BITUMINOUS PAVEMENT <br />24" METAL APRON <br />24" CP PIPE CULVERT <br />TURF ESTABLISHMENT <br />UNIT <br />LUMP SUM <br />LIN FT <br />SQ YD <br />LIN FT <br />SQ Y❑ <br />SQ YD <br />EACH <br />LIN FT <br />LUMP SUM <br />UNIT <br />COST <br />$200.00 <br />$4.00 <br />$5.00 <br />$3.00 <br />$8.00 <br />$34.00 <br />$325.00 <br />$25.00 <br />$200.00 <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />1 <br />96 <br />30 <br />48 <br />30 <br />30 <br />4 <br />96 <br />1 <br />Estimated Construction Cost <br />Contingency (10%) <br />Total Estimated Construction Cost <br />TOTAL <br />ESTIMATED <br />COST <br />$200 <br />$384 <br />$150 <br />$144 <br />$240 <br />$1,020 <br />$1,300 <br />$2,400 <br />$200 <br />$6,038 <br />$604 <br />$6,642 <br />
The URL can be used to link to this page
Your browser does not support the video tag.